An enhanced method for the determination of the ramping reserves
Author(s)
Muzhikyan, Aramazd; Farid, Amro M; Youcef-Toumi, Kamal
DownloadAn enhanced.pdf (775.9Kb)
OPEN_ACCESS_POLICY
Open Access Policy
Creative Commons Attribution-Noncommercial-Share Alike
Terms of use
Metadata
Show full item recordAbstract
Power generation reserves play a central role for maintaining the balance of generation and consumption. Reserves, scheduled in advance, compensate for forecast error, variability and transmission losses. However, as reserves are a costly commodity, their amount should be carefully assessed to prevent unnecessary expense. Currently, the quantity of required reserves are determined based upon a posteriori methods that use operator's experience and established assumptions. While these assumptions have been made out of a level of engineering practicality, they may not be formally true given the numerical evidence. The earlier “sister” paper to this work presented a method to determine the quantity of load following reserves a priori. This paper now uses a similar methodology to determine the quantity of ramping reserves.
Date issued
2015-07Department
Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science; Massachusetts Institute of Technology. Department of Mechanical EngineeringJournal
2015 American Control Conference (ACC)
Publisher
Institute of Electrical and Electronics Engineers
Citation
Muzhikyan, Aramazd, Amro M. Farid, and Kamal Youcef-Toumi. “An Enhanced Method for the Determination of the Ramping Reserves.” 2015 American Control Conference (ACC) (July 2015), pp. 994-1001.
Version: Author's final manuscript
ISBN
978-1-4799-8684-2