Show simple item record

dc.contributor.advisorStanley B. Gershwin.en_US
dc.contributor.authorXu, Zongying, M. Eng. Massachusetts Institute of Technologyen_US
dc.contributor.otherMassachusetts Institute of Technology. Department of Mechanical Engineering.en_US
dc.date.accessioned2018-02-16T19:27:26Z
dc.date.available2018-02-16T19:27:26Z
dc.date.copyright2017en_US
dc.date.issued2017en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/113729
dc.descriptionThesis: M. Eng., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2017.en_US
dc.descriptionThis electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections.en_US
dc.descriptionCataloged from student-submitted PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (pages 119-120).en_US
dc.description.abstractThe boost of the need in semiconductor equipment has brought Varian, a giant in semiconductor manufacturer an increasing demand period. Unsatisfactory on-time delivery in the subassembly production in SMKT, however, has gradually become a critical issue that prevents the production from operating smoothly and efficiently as well as resulting in significant amount of extra financial costs. While the SMKT ontime delivery is generally improved from the two aspects, the material shortage issue and the capacity and priority issue, the second approach was focused, analyzed and well resolved in this thesis. Capacity analysis indicates that more manpower is needed to fulfill the production demand, and an analysis tool based on Excel was created to help with capacity management and planning in a long term. A series of matching algorithms was designed to solve the prioritization issue by providing efficient work plans that direct the production in SMKT assembly process, improving the SMKT on-time delivery by 10-20% and shortening the shop order cycle time in assembly process by one day. Moreover, recommendations on data utilization, capacity management and resources management in SMKT are provided accordingly to optimize the SMKT production to be more proficient and well-organized, which will greatly benefit Varian in the long term. The implementation of this algorithm generates no financial cost except for increasing the assembler's capacity, which indicates that all solutions provided in this thesis are economic and effective at the same time.en_US
dc.description.statementofresponsibilityby Zongying Xu.en_US
dc.format.extent120 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsMIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titleOn-time delivery improvement at a semiconductor equipment manufacturing facility : developing robust work plan to improve resources utilization and shorten production cycle time/en_US
dc.typeThesisen_US
dc.description.degreeM. Eng.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.identifier.oclc1022282724en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record