Show simple item record

dc.contributor.advisorBryan R. Moser.en_US
dc.contributor.authorKwon, Young-Min, S.M. Massachusetts Institute of Technologyen_US
dc.contributor.otherSystem Design and Management Program.en_US
dc.date.accessioned2019-03-11T19:36:31Z
dc.date.available2019-03-11T19:36:31Z
dc.date.copyright2018en_US
dc.date.issued2018en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/120895
dc.descriptionThesis: S.M. in Engineering and Management, Massachusetts Institute of Technology, System Design and Management Program, 2018.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (pages 91-94).en_US
dc.description.abstractA project planning phase is critical to the success of the Public-Private Partnership (PPP) project. The design of a work breakdown structure (WBS) is an essential and effective task in the planning phase. The purpose of this paper is to introduce a new way of designing a WBS through the Work Breakdown Design Pattern Generator (WBDPG). Compared to conventional ways of creating a WBS, the WBDPG helps to design a WBS based on the ability to compare the alternatives and their potential benefits. The core hypothesis of this research is that a well-designed and thus better performing - WBS should increase alignment between situational project requirements and the project's product breakdown structure (PBS) or organizational breakdown structure (OBS). In order to consider this alignment and tradeoffs, a method is proposed which uses morphological and domain mapping matrices to conduct a tradespace and scenario analyses. With this "generator" method, combinations of different breakdown rules across several layers of hierarchy lead to predicted varying levels of performance of the project. For example, a WBS made of functional breakdown rules shows high alignment with the PBS, thus such projects result in better performance related to the product structure. In contrast, a WBS driven by resource breakdown rules aligns highly with the OBS, resulting in high performance related to the organizational structure. In a case where locational difference has a big impact on the project, a WBS made of geographical breakdown rules is likely to lead to better performance. The research concludes that the Work Breakdown Design Pattern Generator can forecast different performance given WBSs designed through different combinations of breakdown rules, and resulting variation in alignment across breakdown structures. Given that PPP projects are often complex, with large-scale and many stakeholders, the method demonstrates a way that structural alternatives can be generated so that the various partners in dialogue can shape their work approach efficiency in the early phase. The research has several limitations and opportunities for extension. In this paper, the organization structure and the product structure are assumed as given. Also, any refinement or change loops to the WBS during the project were not considered.en_US
dc.description.statementofresponsibilityby Young-Min, Kwon.en_US
dc.format.extent94 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsMIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectEngineering and Management Program.en_US
dc.subjectSystem Design and Management Program.en_US
dc.titleDesign patterns for work and organization structures to improve performance in Public-Private Partnershipsen_US
dc.typeThesisen_US
dc.description.degreeS.M. in Engineering and Managementen_US
dc.contributor.departmentMassachusetts Institute of Technology. Engineering and Management Programen_US
dc.contributor.departmentSystem Design and Management Program.en_US
dc.identifier.oclc1088729066en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record