| dc.contributor.advisor | J. B. Babcock. | en_US |
| dc.contributor.author | Lamphier, Thomas J. | en_US |
| dc.date.accessioned | 2019-09-26T17:26:58Z | |
| dc.date.available | 2019-09-26T17:26:58Z | |
| dc.date.copyright | 1949 | en_US |
| dc.date.issued | 1949 | en_US |
| dc.identifier.uri | https://hdl.handle.net/1721.1/122296 | en_US |
| dc.description | Thesis (B.S.) Massachusetts Institute of Technology. Dept. of Civil and Sanitary Engineering, 1949. | en_US |
| dc.description | Bibliography: leaf 24. | en_US |
| dc.description.statementofresponsibility | by Thomas J. Lamphier. | en_US |
| dc.format.extent | 24, [1] leaves | en_US |
| dc.publisher | Massachusetts Institute of Technology | en_US |
| dc.rights | MIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided. | en_US |
| dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | en_US |
| dc.subject | Civil and Sanitary Engineering | en_US |
| dc.title | Proposed centralized traffic control installation and second main track retirement on the Boston And Maine Railroad | en_US |
| dc.type | Thesis | en_US |
| dc.description.degree | B.S. | |
| dc.contributor.department | Massachusetts Institute of Technology. Department of Civil and Environmental Engineering | en_US |
| dc.identifier.oclc | 29329255 | en_US |
| dc.description.collection | Thesis (B.S.) Massachusetts Institute of Technology. Dept. of Civil and Sanitary Engineering, 1949. | en_US |
| dspace.imported | 2020-10-23T19:27:52Z | en_US |