| dc.contributor.advisor | Joseph Shea. | en_US |
| dc.contributor.author | Lundstrom, Mark E. (Mark Emil) | en_US |
| dc.date.accessioned | 2005-08-15T23:26:51Z | |
| dc.date.available | 2005-08-15T23:26:51Z | |
| dc.date.copyright | 1993 | en_US |
| dc.date.issued | 1993 | en_US |
| dc.identifier.uri | http://hdl.handle.net/1721.1/12413 | |
| dc.description | Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Aeronautics and Astronautics, 1993, and Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1993. | en_US |
| dc.description | Includes bibliographical references (p. 149). | en_US |
| dc.description.statementofresponsibility | by Mark E. Lundstrom. | en_US |
| dc.format.extent | 154 p. | en_US |
| dc.format.extent | 10709723 bytes | |
| dc.format.extent | 10709480 bytes | |
| dc.format.mimetype | application/pdf | |
| dc.format.mimetype | application/pdf | |
| dc.language.iso | eng | en_US |
| dc.publisher | Massachusetts Institute of Technology | en_US |
| dc.rights | M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. | en_US |
| dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | |
| dc.subject | Aeronautics and Astronautics | en_US |
| dc.subject | Sloan School of Management | en_US |
| dc.title | Inventory and flowtime reduction through integrating an aerospace manufacturing system | en_US |
| dc.type | Thesis | en_US |
| dc.description.degree | M.S. | en_US |
| dc.contributor.department | Sloan School of Management | en_US |
| dc.contributor.department | Massachusetts Institute of Technology. Department of Aeronautics and Astronautics | |
| dc.identifier.oclc | 29550740 | en_US |