dc.contributor.advisor | Stephen C. Graves. | en_US |
dc.contributor.author | Pappu, Suguna | en_US |
dc.date.accessioned | 2005-08-15T16:35:52Z | |
dc.date.available | 2005-08-15T16:35:52Z | |
dc.date.copyright | 1992 | en_US |
dc.date.issued | 1992 | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.1/13160 | |
dc.description | Thesis (Ph. D.)--Massachusetts Institute of Technology, Sloan School of Management, 1992. | en_US |
dc.description | Includes bibliographical references (leaves 161-166). | en_US |
dc.description.statementofresponsibility | by Suguna Pappu. | en_US |
dc.format.extent | 169 leaves | en_US |
dc.format.extent | 9295219 bytes | |
dc.format.extent | 9294975 bytes | |
dc.format.mimetype | application/pdf | |
dc.format.mimetype | application/pdf | |
dc.language.iso | eng | en_US |
dc.publisher | Massachusetts Institute of Technology | en_US |
dc.rights | M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. | en_US |
dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | |
dc.subject | Sloan School of Management | en_US |
dc.title | Production planning with due-date constraints | en_US |
dc.type | Thesis | en_US |
dc.description.degree | Ph.D. | en_US |
dc.contributor.department | Sloan School of Management | en_US |
dc.contributor.department | Massachusetts Institute of Technology. Operations Research Center | |
dc.identifier.oclc | 26621047 | en_US |