Show simple item record

dc.contributor.advisorJames B. Orlin.
dc.contributor.authorChandra, Anurag, 1977-en_US
dc.contributor.otherMassachusetts Institute of Technology. Operations Research Center.en_US
dc.date.accessioned2023-02-22T21:37:54Z
dc.date.available2023-02-22T21:37:54Z
dc.date.copyright2001en_US
dc.date.issued2001en_US
dc.identifier.urihttps://hdl.handle.net/1721.1/148159
dc.descriptionThesis: S.M., Massachusetts Institute of Technology, Sloan School of Management, Operations Research Center, 2001en_US
dc.descriptionIncludes bibliographical references (leaves 79-80).en_US
dc.description.statementofresponsibilityby Anurag Chandra.en_US
dc.format.extent80 leavesen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsMIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectOperations Research Center.en_US
dc.titleAlgorithms for locomotive schedulingen_US
dc.typeThesisen_US
dc.description.degreeS.M.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Operations Research Centeren_US
dc.identifier.oclc48155077en_US
dc.description.collectionS.M. Massachusetts Institute of Technology, Sloan School of Management, Operations Research Centeren_US
dspace.imported2023-02-22T21:37:54Zen_US
mit.thesis.degreeMasteren_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record