| dc.contributor.advisor | James B. Orlin. | |
| dc.contributor.author | Chandra, Anurag,
1977- | en_US |
| dc.contributor.other | Massachusetts Institute of Technology. Operations Research Center. | en_US |
| dc.date.accessioned | 2023-02-22T21:37:54Z | |
| dc.date.available | 2023-02-22T21:37:54Z | |
| dc.date.copyright | 2001 | en_US |
| dc.date.issued | 2001 | en_US |
| dc.identifier.uri | https://hdl.handle.net/1721.1/148159 | |
| dc.description | Thesis: S.M., Massachusetts Institute of Technology, Sloan School of Management, Operations Research Center, 2001 | en_US |
| dc.description | Includes bibliographical references (leaves 79-80). | en_US |
| dc.description.statementofresponsibility | by Anurag Chandra. | en_US |
| dc.format.extent | 80 leaves | en_US |
| dc.publisher | Massachusetts Institute of Technology | en_US |
| dc.rights | MIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided. | en_US |
| dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | en_US |
| dc.subject | Operations Research Center. | en_US |
| dc.title | Algorithms for locomotive scheduling | en_US |
| dc.type | Thesis | en_US |
| dc.description.degree | S.M. | en_US |
| dc.contributor.department | Massachusetts Institute of Technology. Operations Research Center | en_US |
| dc.identifier.oclc | 48155077 | en_US |
| dc.description.collection | S.M. Massachusetts Institute of Technology, Sloan School of Management, Operations Research Center | en_US |
| dspace.imported | 2023-02-22T21:37:54Z | en_US |
| mit.thesis.degree | Master | en_US |