Show simple item record

dc.contributor.authorGray, Luke Alexander, author.en_US
dc.contributor.authorSlocum, Alexander H.,en_US
dc.contributor.authorDu, Qien_US
dc.contributor.otherMassachusetts Institute of Technology. Department of Mechanical Engineering.en_US
dc.date.accessioned2023-04-07T16:54:34Z
dc.date.available2023-04-07T16:54:34Z
dc.date.copyright2018en_US
dc.date.issued2018en_US
dc.identifier.urihttps://hdl.handle.net/1721.1/150462
dc.descriptionThesis: S.B., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2018en_US
dc.descriptionSupervised by Alexander H. Slocum. Cataloged from PDF of thesis. Vitae.en_US
dc.descriptionIncludes bibliographical references (pages 83-86).en_US
dc.description.abstractAs the demand for and viability of renewable energies has increased, connecting remote power generation stations to demand centers has become more important. High Voltage Direct Current (HVDC) transmission systems offer efficiency and cost effectiveness over long distances, allow for the linkage of incompatible AC grids, and can be immune to telluric currents and aggressive EMP attacks, which all make these systems particularly applicable to connecting to remote renewables. With the current state-of-the-art in HVDC, overhead lines (OHL) are several times cheaper than underground cables (UGC). However, OHLs have security risks and create substantial visual pollution, which has resulted in significant public opposition and lengthy delays in project permitting. Project developers have reluctantly agreed to replace portions of overhead line with underground cable as a concession to these stakeholders. One way to make UGCs more attractive to developers is to reduce cost by locating UGC systems along railroad right of ways. The increased mobility of heavy machines and materials on railroads and the state-of-the-art in railroad construction machinery provide both precedent and process advantages, which make the concept of augmenting railroads with underground cable systems an attractive one. The practice of installing and maintaining such systems could be less complex than traditional methods required by independent transmission corridors. The use of private railways may avoid conflicts with external stakeholders and eliminate the regulatory delays that have plagued many renewable energy transmission projects. Additionally, taking advantage of the increased accessibility of railroads by in-situ manufacturing high voltage, extruded cable in lengths far greater than what is currently able to be transported by road haulage, may reduce overall project costs by eliminating expensive and vulnerable cable splices. To accomplish this, here we present a method for continuously manufacturing and installing high voltage undergourd cable from a moving "Cable Train" using public-private railway systems. There are three primary challenges associated with such a mobile platform -- extrusion, curing, and degassing. Several promising countermeasures have been presented, which require varying levels of further development continuous extrusion, horizontal curing, and inline degassing. Herein, further discussions on standards, system topology, earthworks, practical limitations to cable production length, and cost estimation, can also be found. The technology and methods to accomplish this vision can be achieved by a pre-competitive technology consortium with member companies capable of completing and fully realizing the proof-of-concept designs proposed.en_US
dc.description.statementofresponsibilityby Luke A. Gray, Alexander H. Slocum and Qi Du.en_US
dc.format.extent86 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsMIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titleCable train : a platform for in-situ manufacturing of underground cableen_US
dc.title.alternativePlatform for in-situ manufacturing of underground cableen_US
dc.typeAcademic theses.en_US
dc.typeAcademic theses.en_US
dc.typeThesisen_US
dc.description.degreeS.B.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineeringen_US
dc.identifier.oclc1373628237en_US
dc.description.collectionS.B. Massachusetts Institute of Technology, Department of Mechanical Engineeringen_US
dspace.imported2023-04-07T16:54:33Zen_US
mit.thesis.degreeBacheloren_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record