Show simple item record

dc.contributor.advisorErik Vanmarcke.en_US
dc.contributor.authorBermúdez Marcos, Joséen_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Civil Engineering.en_US
dc.date.accessioned2005-08-08T15:51:48Z
dc.date.available2005-08-08T15:51:48Z
dc.date.copyright1985en_US
dc.date.issued1985en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/15145
dc.descriptionThesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1985.en_US
dc.descriptionMICROFICHE COPY AVAILABLE IN ARCHIVES AND ENGINEERINGen_US
dc.descriptionBibliography: leaves 121-123.en_US
dc.description.statementofresponsibilityby José Bermúdez Marcos.en_US
dc.format.extent123 leavesen_US
dc.format.extent6733871 bytes
dc.format.extent6733630 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectCivil Engineering.en_US
dc.titleAnalysis and quantification of risk of cost overruns in construction projectsen_US
dc.typeThesisen_US
dc.description.degreeM.S.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Civil Engineeringen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Civil and Environmental Engineering
dc.identifier.oclc14229340en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record