Show simple item record

dc.contributor.authorMatthews, Lynn D.
dc.contributor.authorCrew, Geoffrey B.
dc.date.accessioned2026-02-13T21:25:07Z
dc.date.available2026-02-13T21:25:07Z
dc.date.issued2026-02-13
dc.identifier.urihttps://hdl.handle.net/1721.1/164885
dc.descriptionThis report was prepared for the formal acceptance of the software required for Cycle 8. Notionally it is ALMA Technical Note #TBD, but not (yet) published as such.en_US
dc.description.abstractThis document contains material proposed for ALMA Cycle 8 as well as a follow-up note provided to the reviewers. The new capabilities were a passive phasing mode (for weaker sources), an ALMA Band 3 pulsar observing mode, and a prototype spectral line mode, also for Band 3. In the event, the first two were accepted for a Cycle 8 that was delayed by the COVID-19 pandemic. The spectral line capability was deferred until Cycle 9.en_US
dc.description.sponsorshipThe NA ALMA Development Programen_US
dc.subjectRadio Astronomyen_US
dc.subjectALMA Observatoryen_US
dc.subjectVery Long Baseline Interferometryen_US
dc.titleAPP2 Status Summary: Proposed New VLBI Capabilities for Cycle 8en_US
dc.typeTechnical Reporten_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record