Show simple item record

dc.contributor.authorMatthews, Lynn D.
dc.contributor.authorCrew, G. B.
dc.date.accessioned2026-03-05T19:16:26Z
dc.date.available2026-03-05T19:16:26Z
dc.date.issued2015-09-04
dc.identifier.urihttps://hdl.handle.net/1721.1/165052
dc.descriptionThis report was prepared to report on APP commissioning progress, provided as ALMA Technical Note #17.
dc.description.abstractThe primary objective for the second APP CSV campaign was to test and characterize the phasing system, including the recent changes in the handling of the front-end delays. Secondary goals were to repeat the local VLBI test between ALMA and an antenna at the Operations Support Facility (OSF) (also attempted during the January mission) and to obtain a short VLBI recording on a calibrator source with ALMA and one or more stations operating as part of the Event Horizon Telescope (EHT) network, thus allowing demonstration of an intercontinental VLBI fringe. This is a report of the week's activities.en_US
dc.description.sponsorshipThe NA ALMA Development Funden_US
dc.publisherThe Joint ALMA Observatoryen_US
dc.subjectRadio Astronomyen_US
dc.subjectALMA Observatoryen_US
dc.subjectVery Long Baseline Interferometryen_US
dc.titleSummary of the Second ALMA Phasing Project (APP) Commissioning and Science Verification Mission: 2015 March 24-30en_US
dc.typeTechnical Reporten_US
dc.identifier.citationhttps://almascience.nrao.edu/documents-and-tools/alma-technical-notes/ALMATechnicalNote17_FINAL.pdfen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record