Now showing items 12-31 of 52

    • The Guide to Lean Enablers for Managing Engineering Programs 

      Oehmen, Josef; Oppenheim, Bohdan W.; Secor, Deborah; Norman, Eric; Rebentisch, Eric; e.a. (Joint MIT‐PMI‐INCOSE Community of Practice on Lean in Program Management, 2012-05)
      This document provides the findings of the Joint MIT‐PMI‐INCOSE Lean in Program Management Community of Practice that are based on a 1‐year project executed during 2011 and 2012. The community was made up of selected subject ...
    • A Holistic Approach to Manufacturing System Design in the Defense Aerospace Industry 

      Vaughn, Amanda; Shields, J. Thomas (International Council of the Aeronautical Sciences, 2002)
      Manufacturing has evolved to become a critical element of the competitive skill set of defense aerospace firms. Given the changes in the acquisition environment and culture; traditional “thrown over the wall” means of ...
    • A HOLISTIC APPROACH TO MANUFACTURING SYSTEM DESIGN IN THE DEFENSE AEROSPACE INDUSTRY 

      Vaughn, Amando F.; Shields, Tom (International Council of the Aeronautical Sciences, 2002)
      Manufacturing has evolved to become a critical element of the competitive skill set of defense aerospace firms. Given the changes in the acquisition environment and culture; traditional “thrown over the wall” means of ...
    • Implementation Workshop: High Performance Work Organizations 

      Klein, Jan; Cutcher-Gershenfeld, Joel; Barrett, Betty (Masschusetts Institute of Technology, 1997-04)
      Since the rise of the industrial revolution, there are few challenges that compare in scale and scope with the challenge of implementing lean principles in order to achieve high performance work systems. This report ...
    • Implementation Workshop: High Performance Work Organizations 

      Klein, Janice; Cutcher-Gershenfeld, Joel; Barrett, Betty (1997-04)
      A report on findings from the first Lean Aircraft Initiative (LAI) Implementation Workshop held on February 5-6, 1997. The report is not a "cookbook" or a "how to" manual. Rather, it is a summary of the first phase in a ...
    • Implementation Workshop: High Performance Work Organizations 

      Klein, Jan; Cutcher-Gershenfeld, Joel; Barrett, Betty (Massachusetts Institute of Technology, 1997-04)
      Since the rise of the industrial revolution, there are few challenges that compare in scale and scope with the challenge of implementing lean principles in order to achieve high performance work systems. This report summarize ...
    • Improving the Software Upgrade Value Stream 

      Ippolito, Brian (2001-09)
      This paper reports findings from a two-year study to identify Lean practices for deriving software requirements from aerospace system level requirements, with a goal towards improving the software upgrade value stream.
    • Introduction to LAI 

      Murman, Earll (Massachusetts Institute of Technology, 2001-09-26)
      Why LAI? How does LAI work? What use is LAI to others? How far has LAI come and where will we go next?
    • Labor Support Survey Summary Report 

      Klein, Janice (1996-10)
      One of the main cost drivers in the defense aerospace industry is overhead personnel. Traditionally, labor support ratios have been used as an efficiency measure and to control overhead levels. This report outlines the ...
    • Lean Aircraft Initiative Implementation Workshop #3: Customer and Supplier Integration Across the Supply Chain 

      Cutcher-Gershenfeld, Joel; Bertelli, Dominick (1999-02)
      The integration of customers and suppliers along the supply chain involves a fundamental transformation of the way business is conducted in the Aerospace industry. Lean Aerospace Initiative (LAI) members, as well as ...
    • Lean Aircraft Initiative Implementation Workshop: Implementing Cross-Functional Teams in an IPPD Environment 

      Cutcher-Gershenfeld, Joel; Klein, Jan; Pomponi, Renata (1998-01)
      There is an emerging consensus in the Aerospace sector around the importance of Integrated Product and Process Development (IPPD). Now nearly every new program is now established around a set of Integrated Product Teams ...
    • Lean Enterprise Self-Assessment Tool (LESAT) 

      Nightingale, Debbie (Massachusetts Institute of Technology, 2000-12-14)
      -Status report on June Executive Board commitments -Enterprise-level LESAT Beta Version -Detailed-level LESAT Development Plan -Industry and government participation and support requirements -Resource Needs -Executive ...
    • Lean Implementation Considerations in Factory Operations of Low Volume/High Complexity Production Systems 

      Shields, Thomas J. (1997-11)
      The researchers of the Lean Aircraft Initiative developed a hypothesized lean implementation model seeking to provide its members guidance on implementing lean transitions in factory operations of low volume/high complexity ...
    • Lean Transition of Emerging Industrial Capability 

      Shroyer, E (2000-04)
      This volume of the final report documents the technical work performed from December 1998 through December 2002 under Cooperative Agreement F33615-97-2-5153 executed between the U.S. Air Force, Air Force Research Laboratory, ...
    • Lean Transition of Emerging Industrial Capability (LeanTEC) 

      Shroyer, E. (2002-03)
      Lean Transition of Emerging Industrial Capability (LeanTEC) program was a cooperative agreement between the Boeing Company and AFRL conducted from January 1998 to January 2002. The results of this program are documented ...
    • The Lean Value Principle in Military Aerospace Product Development 

      Slack, Robert (1999-07)
      This document takes a critical look at the first lean principle, Value. The meaning of value is ivestigated in: 1.) general context, 2.) product development context and 3.) the business literature context. Insights about ...
    • Lifecycle Value Framework for Tactical Aircraft Product Development 

      Hallander, Ingrid; Stanke, Alexis (Massachusetts Institute of Technology & Linköping University, 2001-04)
      Due to a dramatic reduction in defense procurement, the benchmark for developing new defense systems today is performance at an affordable cost. In an attempt to encircle a more holistic perspective of value, lifecycle ...
    • Manufacturing Change at the John Deere Harvester Works: Report on the Visit of the Ad Hoc Lean Aircraft Initiative Team, June 7, 1994 

      Stahl, Fred (1994-11)
      On June 7, 1994, an Ad Hoc team from LAI visited John Deere to conduct an informal benchmark of John Deere's successful change to Leaner Manufacturing. This report summarizes the results of that trip, as well as summarizing ...
    • Measuring Value in Product Development 

      Smith, Jim (Massachusetts Institute of Technology, 2000-03)
      “What is value in product development?” is the key question of this paper. The answer is critical to the creation of lean in product development. By knowing how much value is added by product development (PD) activities, ...