MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Undergraduate Theses
  • View Item
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Undergraduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

The constraints and limitations of manufacturing resource planning (MRP II) as a tool for shop floor control

Author(s)
Mbaya, Martin (Martin Njagi), 1977-
Thumbnail
DownloadFull printable version (4.995Mb)
Other Contributors
Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
Advisor
David S. Cochran.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
Manufacturing Resource Planning (MRP II) is a planning system used in various industries to manage manufacturing resources. This study explored the suitability of MRP II in controlling the shop floor by analyzing its constraints and limitations. The study is part of a larger effort by MIT's Production System Design Laboratory to establish an information system that meets the functional requirements of a physical (manufacturing) system. A literature survey of different books and papers on MRP II and Shop Floor Control was conducted and supplemented by interviews with individuals who have worked with MRP II systems. The production System Design Decomposition, a diagnostic tool developed by the Production System Design Laboratory was then used to determine what the constraints and limitations facing MRP II on the shop floor were. A case study at company X, a centrifuge manufacturer which uses MRP II in its production process was then used to tie in the issues raised from the literature survey with a real world example. The results of the literature review and the case study both revealed that MRP II was a poor tool for controlling the shop floor and proposed the use of hybrid systems that combined Kanban control with the strong planning capabilities of MRP II.
Description
Thesis (S.B.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2000.
 
Includes bibliographical references (leaves 63-64).
 
Date issued
2000
URI
http://hdl.handle.net/1721.1/28226
Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Publisher
Massachusetts Institute of Technology
Keywords
Mechanical Engineering.

Collections
  • Undergraduate Theses

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.