MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

A decision-support model for managing the fuel inventory of a Panamanian generating company

Author(s)
Perez-Franco, Roberto, 1976-
Thumbnail
DownloadFull printable version (8.535Mb)
Other Contributors
Massachusetts Institute of Technology. Engineering Systems Division.
Advisor
Stephen Graves.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
Bahia Las Minas Corp (BLM) is a fuelpowered generating company in the Panamanian power system. The purpose of this thesis is to design and evaluate a decision-support model for managing the fuel inventory of this company. First, we research BLM and its fuel replenishment methods. Then we define the problem, its objective function, assumptions, parameters and constraints. After identifying the most important given information (fuel price forecast, demand forecast, and current inventory levels), we define the equations that relate these inputs with the order sizes, and the availability and reserve constraints. Due to the large number of constraints, we devise a mechanism to calculate lower limits for the aggregate order sizes that prevent violations of the constraints beyond user-defined limits. We prepare a model in Excel for use with a single fuel type. This model takes stochastic forecasts of demand and fuel prices, and determines the best size for the weekly fuel order. After testing the model under several different scenarios, we conclude that it responds correctly to changes in price and demand. The complete discussion of these results can be found in the body of the thesis. Finally, we present some recommendations for BLM, both in relation to this replenishment problem and to its supply chain in general.
Description
Thesis (M. Eng. in Logistics)--Massachusetts Institute of Technology, Engineering Systems Division, 2004.
 
Includes bibliographical references (leaf 89).
 
Date issued
2004
URI
http://hdl.handle.net/1721.1/28507
Department
Massachusetts Institute of Technology. Engineering Systems Division
Publisher
Massachusetts Institute of Technology
Keywords
Engineering Systems Division.

Collections
  • Graduate Theses
  • SCALE Research Reports

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.