MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

A study of the Naval Construction Force project material supply chain

Author(s)
Stasick, Steven J. (Steven James), 1970-
Thumbnail
DownloadFull printable version (11.64Mb)
Alternative title
Sudy of the NCF project material supply chain
Other Contributors
Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.
Advisor
Fred Moavenzadeh.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
The Naval Construction Force (NCF) performs construction projects in all areas of the world during both peacetime and war. While some of these projects occur in populated areas where project materials are readily available, many of these projects occur in remote areas or war zones, where project materials must be procured from the United States or elsewhere and shipped to the unit performing the construction. The construction scopes also vary from projects as small as concrete sidewalks to projects as large as full utility system installations, or complete facility and base construction. As a result of the diverse locations and project types that the Naval Construction Force experiences, the logistics of providing project material and construction equipment to multiple global locations is a major challenge. The Naval Construction Force still experiences delays and inefficiencies in supplying construction materials to its various projects and units deployed throughout the world, which in turn reduces the overall productivity of the deployed Construction Battalions. This research explores the current supply chain that the NCF has in place for obtaining construction project materials. It also explores the latest initiatives in information technology and construction supply chain management that are being applied in the commercial sector.
 
(cont.) The two systems are compared to determine what private practices and technologies can be applied to the Navy system to make it more efficient. Since the Navy is restricted by Federal Acquisition Regulations, and has unique funding streams authorized by Congress, it will not have the ability to fully operate as a private construction company, and these restrictions are addressed. The issue of outsourcing and privatization is also studied, and the feasibility of outsourcing the entire construction material process is considered.
 
Description
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2004.
 
Includes bibliographical references (p. 137-141).
 
Date issued
2004
URI
http://hdl.handle.net/1721.1/29399
Department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering
Publisher
Massachusetts Institute of Technology
Keywords
Civil and Environmental Engineering.

Collections
  • Graduate Theses

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.