Show simple item record

dc.contributor.advisorFrederick P. Salvucci.en_US
dc.contributor.authorRaspall Galli, Demian, 1973-en_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.en_US
dc.date.accessioned2005-10-14T20:21:31Z
dc.date.available2005-10-14T20:21:31Z
dc.date.copyright2004en_US
dc.date.issued2004en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/29403
dc.descriptionThesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2004.en_US
dc.descriptionIncludes bibliographical references (p. 151-154).en_US
dc.description.abstractThe last decade of the twentieth century was characterized by financial and budget constraints in almost all government activities. Transportation was no exception, and many countries moved to private operation as a way to reduce their need for operating and capital subsidies, and acquire technical competency to produce higher quality public services. Private participation, however, may require the implementation of a regulatory instrument to ensure the accomplishment of public goals. The most common form of regulation for large transit systems is the use of concession contracts. They govern the relationship between the government and the private provider, converting government's objectives into the economic variables that guide the private firm behavior. This thesis analyzes a variety of issues that should be considered by a government agency studying private involvement in transit operations by bringing together concepts from different fields such as economics, law, political science, negotiation, policy making, engineering, and transportation science. First the entire menu of alternatives for private participation and regulation is presented, and the advantages and disadvantages of contracts as legal instruments are analyzed. Next, a qualitative approach uses a six stages project evolution framework to identify the most relevant variables that can considerably affect the outcome of the concession process and analyzes them in detail. Third, a quantitative approach uses a business model to study the relevance of the incentives and penalties arrangement in the contract and its influence in the service outcome.en_US
dc.description.abstract(cont.) And finally, three case studies provide the evidence and lessons from real experience to fund and explore the findings of the entire analysis. The theoretical analysis and the case studies show that competency and honesty in both the government oversight and the concession are a requirement to run the concession process efficiently and effectively. Transparency and publicity, labor negotiations, asset deterioration during the process, adequate timing and flexibility in operations and control have been identified as extremely relevant variables affecting concession results. Contract incentives and penalties can affect contract outcome, but the agency-contractor relationship and the parties' optimization horizon are the most important consideration in successful concessions. Only competent and honest management are capable of achieving win-win opportunities.en_US
dc.description.statementofresponsibilityby Demian Raspall Galli.en_US
dc.format.extent154 p., [3] leaves of folded platesen_US
dc.format.extent7083874 bytes
dc.format.extent7083682 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectCivil and Environmental Engineering.en_US
dc.titleControl, incentives and penalties in the transit contracting processen_US
dc.typeThesisen_US
dc.description.degreeS.M.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Civil and Environmental Engineering
dc.identifier.oclc56132753en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record