Show simple item record

dc.contributor.advisorMichael W. Golay.en_US
dc.contributor.authorKim, Dohyoung, 1970-en_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Nuclear Engineering.en_US
dc.date.accessioned2006-03-24T18:11:34Z
dc.date.available2006-03-24T18:11:34Z
dc.date.copyright2002en_US
dc.date.issued2002en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/30011
dc.descriptionThesis (Sc. D.)--Massachusetts Institute of Technology, Dept. of Nuclear Engineering, 2002.en_US
dc.descriptionIncludes bibliographical references (leaves 192-194).en_US
dc.description.abstractThe growing need for improved project management technique points to the usefulness of a knowledge-base advisory system to help project managers understand current and future project status and optimize decisions based upon the project performances. The work here demonstrates the framework of an advisory system with improved ability in project management. Based upon the literature survey and discussion with relevant experts, the Bayesian Belief Network (BBN) approach was selected to model the steam generator replacement proj ect management problem, where the situation holds inherently large uncertainty and complexities, since it has a superior ability to treat complexities, uncertainty management, systematic decision making, inference mechanism, knowledge representation and model modification for newly acquired knowledge. Two modes of advisory system have been constructed. As the first mode, the predictive mode has been developed, which can predict future project performance state probability distributions, assuming no intervening management action. The second mode is the advisory mode, which can identify the optimal action among alternatives based upon the expected net benefit values that are incorporating two important components: 1) expected immediate net benefits at post-action time, and 2) the expected long term benefit (or penalty) at scheduled project completion time. During the work, new indices for important variables have been newly developed for effective and efficient project status monitoring. With application of developed indices to the advisory system, the long term benefit (or penalty) found to be the most important factor in determining the optimal action by the project management during the decisionen_US
dc.description.abstract(cont.) making process and was confirmed by the domain experts. As a result, the effort has been focused on incorporating the long term benefit (or penalty) concept in order to provide more reliable and accurate advice to the project managers. In addition, in order to facilitate the communication between the BBN models and the users, an interface program has been developed using the Visual Basic language.en_US
dc.description.statementofresponsibilityby Dohyoung Kim.en_US
dc.format.extent230 leavesen_US
dc.format.extent9378303 bytes
dc.format.extent9378112 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectNuclear Engineering.en_US
dc.titleBayesian Belief Network (BBN)-based advisory system development for steam generator replacement project managementen_US
dc.title.alternativeBBN-based advisory system development for steam generator replacement project managementen_US
dc.typeThesisen_US
dc.description.degreeSc.D.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Nuclear Engineeringen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Nuclear Science and Engineering
dc.identifier.oclc55012884en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record