dc.contributor.advisor | Ronald L. Rivest. | en_US |
dc.contributor.author | Lloyd, Errol Lynn | en_US |
dc.date.accessioned | 2006-02-02T18:36:12Z | |
dc.date.available | 2006-02-02T18:36:12Z | |
dc.date.copyright | 1980 | en_US |
dc.date.issued | 1980 | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.1/30984 | |
dc.description | Thesis. 1980. Ph.D.--Massachusetts Institute of Technology. Dept. of Electrical Engineering and Computer Science. | en_US |
dc.description | MICROFICHE COPY AVAILABLE IN ARCHIVES AND ENGINEERING. | en_US |
dc.description | Vita. | en_US |
dc.description | Bibliography: leaves 144-145. | en_US |
dc.format.extent | 146 leaves | en_US |
dc.format.extent | 6511685 bytes | |
dc.format.extent | 6531252 bytes | |
dc.format.mimetype | application/pdf | |
dc.format.mimetype | application/pdf | |
dc.language.iso | eng | en_US |
dc.publisher | Massachusetts Institute of Technology | en_US |
dc.rights | M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. | en_US |
dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | |
dc.subject | Electrical Engineering and Computer Science | en_US |
dc.subject.lcsh | Production scheduling | en_US |
dc.subject.lcsh | Critical path analysis | en_US |
dc.title | Scheduling task systems with resources. | en_US |
dc.type | Thesis | en_US |
dc.description.degree | Ph.D. | en_US |
dc.contributor.department | Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science | |
dc.identifier.oclc | 07027043 | en_US |