Show simple item record

dc.contributor.advisorJudith Layzer.en_US
dc.contributor.authorBrandenburg, Peter (Peter J.)en_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Urban Studies and Planning.en_US
dc.coverage.spatialn-us---en_US
dc.date.accessioned2006-06-19T17:32:29Z
dc.date.available2006-06-19T17:32:29Z
dc.date.copyright2005en_US
dc.date.issued2005en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/33014
dc.descriptionThesis (M.C.P.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 2005.en_US
dc.descriptionIncludes bibliographical references (p. 89-93).en_US
dc.description.abstractThe U.S. Bureau of Land Management (BLM) has begun to embrace the concept adaptive management as an alternative to traditional natural resource planning and management models. Adaptive management may provide BLM managers with a means to evaluate the effectiveness of management actions, the flexibility to adjust actions that have not proved effective, opportunities for rapid learning relevant to improved management, and improved public support for resource management decisions. To realize these benefits, BLM must include two critical elements in its adaptive management strategies: 1) adaptive design of management objectives, actions, monitoring and evaluation protocols and 2) effective collaboration among BLM and interested stakeholders. I evaluate three case studies of BLM adaptive management and find that none of the cases have fully included the critical elements. While there are some encouraging signs, the cases collectively reveal several key shortcomings. The strategies have not capitalized on the potential to improve management through learning. Two cases illustrate the risk that adaptive management may be misapplied to remove requirements for predictive impact analysis and mitigation, putting resources at risk. The cases have not featured a joint fact finding collaborative structure to provide stakeholders with early and integrated roles in the adaptive management process. I also identify a number of institutional barriers that have prevented BLM from consistently including the critical elements.en_US
dc.description.abstract(Cont.) If BLM cannot remove these barriers by providing agency-wide policy and guidance for adaptive management, capacity building for local staff and stakeholders and adequately funded, binding implementation commitments, the agency will not realize the 'benefits it seeks and adaptive management will not represent a significant improvement to BLM's practice of natural resource management.en_US
dc.description.statementofresponsibilityby Peter Brandenburg.en_US
dc.format.extent102 p.en_US
dc.format.extent5762322 bytes
dc.format.extent5768069 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectUrban Studies and Planning.en_US
dc.titleEvaluating next-generation environmental policy tools : adaptive management in the Bureau of Land Managementen_US
dc.typeThesisen_US
dc.description.degreeM.C.P.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Urban Studies and Planning
dc.identifier.oclc62081779en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record