MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Co-ordinating flows across supply chains in the low volume gas turbine industry

Author(s)
Park, Miriam, 1971-
Thumbnail
DownloadFull printable version (6.618Mb)
Other Contributors
Leaders for Manufacturing Program.
Advisor
Donald B. Rosenfield and Thomas W. Eager.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://theses.mit.edu/Dienst/UI/2.0/Describe/0018.mit.theses%2f2000-88 http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
The industrial gas turbine (IGT) market is experiencing exponential growth where competition is based upon technical performance and time to market. Product sales are limited by the ability of the Original Equipment Manufacturer (OEM) to coordinate manufacturers and assemblers to deliver turbines to customers in a timely manner. The company's logistics and supply chain systems have evolved from a traditional low volume job-shop environment and must now cope with a marked increase in product demand. OEM's must now manage the manufacture and assembly of thousands of turbine parts across an international and complex supply chain in a robust and agile manner. This requires the effective integration of internal and external logistics, supply chain and engineering talent. Current performance has been plagued with poor sourcing reliability, low quality and exploding lead times. This has resulted in sluggish response to customer demand and loss in earnings. This thesis seeks to recommend inventory placement strategies to improve sourcing reliability while identifying root causes and recommending improvements. It will also address the importance of the time-value of material in addressing investment and materials management decisions.
Description
Thesis (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Materials Science and Engineering; in conjunction with the Leaders for Manufacturing Program, Massachusetts Institute of Technology, 2000.
 
Also available online at the MIT Theses Online homepage <http://thesis.mit.edu>.
 
Includes bibliographical references (p. 80).
 
Date issued
2000
URI
http://theses.mit.edu/Dienst/UI/2.0/Describe/0018.mit.theses%2f2000-88
http://hdl.handle.net/1721.1/34708
Department
Leaders for Manufacturing Program at MIT; Massachusetts Institute of Technology. Department of Materials Science and Engineering; Sloan School of Management
Publisher
Massachusetts Institute of Technology
Keywords
Sloan School of Management., Materials Science and Engineering., Leaders for Manufacturing Program.

Collections
  • Graduate Theses

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.