Show simple item record

dc.contributor.advisorDavid Simchi-Levi.en_US
dc.contributor.authorEgan, Sarah (Sarah J.)en_US
dc.contributor.otherLeaders for Manufacturing Program.en_US
dc.date.accessioned2006-11-08T16:47:22Z
dc.date.available2006-11-08T16:47:22Z
dc.date.copyright2005en_US
dc.date.issued2005en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/34841
dc.descriptionThesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2005.en_US
dc.descriptionIncludes bibliographical references (p. 61).en_US
dc.description.abstractThis thesis addresses Six Sigma process improvements and the supplier management issues resulting from the shift to external suppliers in the aftermath of a fire. Originally, this thesis was to address a lean implementation in Raytheon's substrate fabrication area. It was intended to build on work done by Satish Krishnan, which focused on a lean implementation in a related area. However, a fire in Raytheon's El Segundo substrate area forced Raytheon to outsource substrate production and brought to the forefront a different set of challenging issues. The fire shut down production for 21 days, creating pressure to capture lost ground once operations resumed. The increased demand and burden on resources during the recovery uncovered inefficiencies in key processes. One of the areas that increased in importance following the fire was magnet assembly. The first half of this thesis (Chapter 3 through Chapter 6) applies Raytheon's Six Sigma framework to the magnet assembly process in an effort to reduce non-value added work and increase standardization and control. Six Sigma incorporates many of the principles of lean manufacturing, such as continuous improvement and the elimination of non-value added work.en_US
dc.description.abstract(cont.) The first half of this thesis focuses on the Six Sigma framework because of Raytheon's strong commitment to the approach, rather than the larger set of issues in lean manufacturing. Typically, the vertical integration decision is one of the key strategic choices facing a firm. The fire crippled Raytheon's substrate fabrication area and changed this decision from a strategic one to a tactical one. Rebuilding the substrate capability in El Segundo would require close to a year. In the short term, Raytheon was forced to shift substrate production from El Segundo to external suppliers or alternate internal sites. The second half of this thesis (Chapter 7 and Chapter 8) addresses the issues associated with outsourcing a technically complex product. The initial substrate offload accelerated the timeframe for establishing suppliers and for dealing with concerns like intellectual property, coordination, dependency and the strategic consequences of outsourcing a key technology. This thesis attempts to address these implementation issues as well as the strategic implications of outsourcing substrates.en_US
dc.description.statementofresponsibilityby Sarah Egan.en_US
dc.format.extent61 p.en_US
dc.format.extent3110247 bytes
dc.format.extent3112710 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectSloan School of Management.en_US
dc.subjectCivil and Environmental Engineering.en_US
dc.subjectLeaders for Manufacturing Program.en_US
dc.titleSix Sigma process improvements and sourcing strategies following factory fireen_US
dc.typeThesisen_US
dc.description.degreeS.M.en_US
dc.description.degreeM.B.A.en_US
dc.contributor.departmentLeaders for Manufacturing Program at MITen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Civil and Environmental Engineering
dc.contributor.departmentSloan School of Management
dc.identifier.oclc63192648en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record