Show simple item record

dc.contributor.advisorJeremy F. Shapiro.en_US
dc.contributor.authorChu, Michael Yi Xinen_US
dc.date.accessioned2007-02-21T11:05:23Z
dc.date.available2007-02-21T11:05:23Z
dc.date.copyright1995en_US
dc.date.issued1995en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/36021
dc.descriptionThesis (M.S.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science, 1995.en_US
dc.descriptionIncludes bibliographical references (leaves 46-49).en_US
dc.description.statementofresponsibilityby Michael Yi Xin Chu.en_US
dc.format.extent49 leavesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectElectrical Engineering and Computer Scienceen_US
dc.titleCombining heuristics and integer programming for optimizing job shop scheduling modelsen_US
dc.typeThesisen_US
dc.description.degreeM.S.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Electrical Engineering and Computer Science
dc.contributor.departmentMassachusetts Institute of Technology. Operations Research Center
dc.identifier.oclc32905957en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record