dc.contributor.advisor | Jeremy F. Shapiro. | en_US |
dc.contributor.author | Chu, Michael Yi Xin | en_US |
dc.date.accessioned | 2007-02-21T11:05:23Z | |
dc.date.available | 2007-02-21T11:05:23Z | |
dc.date.copyright | 1995 | en_US |
dc.date.issued | 1995 | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.1/36021 | |
dc.description | Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science, 1995. | en_US |
dc.description | Includes bibliographical references (leaves 46-49). | en_US |
dc.description.statementofresponsibility | by Michael Yi Xin Chu. | en_US |
dc.format.extent | 49 leaves | en_US |
dc.language.iso | eng | en_US |
dc.publisher | Massachusetts Institute of Technology | en_US |
dc.rights | M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. | en_US |
dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | |
dc.subject | Electrical Engineering and Computer Science | en_US |
dc.title | Combining heuristics and integer programming for optimizing job shop scheduling models | en_US |
dc.type | Thesis | en_US |
dc.description.degree | M.S. | en_US |
dc.contributor.department | Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science | |
dc.contributor.department | Massachusetts Institute of Technology. Operations Research Center | |
dc.identifier.oclc | 32905957 | en_US |