Documentation requirements for contractor pursuit of delay claims
Author(s)
Long, Darren S. (Darren Scott)
DownloadFull printable version (5.772Mb)
Advisor
Robert D. Logcher.
Terms of use
Metadata
Show full item recordDescription
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1995. Includes bibliographical references (leaves 127-135).
Date issued
1995Department
Massachusetts Institute of Technology. Department of Civil and Environmental EngineeringPublisher
Massachusetts Institute of Technology
Keywords
Civil and Environmental Engineering