Show simple item record

dc.contributor.advisorDavid Geltner.en_US
dc.contributor.authorTan, Yew Chinen_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Architecture.en_US
dc.coverage.spatiala-my---en_US
dc.date.accessioned2007-06-27T20:27:34Z
dc.date.available2007-06-27T20:27:34Z
dc.date.copyright2006en_US
dc.date.issued2006en_US
dc.identifier.urihttp://dspace.mit.edu/handle/1721.1/37446en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/37446
dc.descriptionThesis (S.M.)--Massachusetts Institute of Technology, Dept. of Architecture, 2006.en_US
dc.descriptionThis electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections.en_US
dc.descriptionIncludes bibliographical references (leaves 61-64).en_US
dc.description.abstractThe real estate and construction sectors are very important and integral part of the Malaysian economy. At a macro-level, governmental development plans in Malaysia are based on successive five year plans since 1956. For each of the five year plans, the real estate and construction sectors feature prominently in terms of value and policy implementation. The budget for the five year plans is in relation to public sector expenditure and does not include private sector initiatives. As regards real estate project delivery methods in Malaysia, the most common form is the traditional design-bid-build method. The design-build method is getting some acceptance of late, whereas infrastructure projects do adopt the build-operate-transfer method. This thesis seeks to classify, analyze and compare the various types of delivery methods and thereafter examine whether there is a methodology for selecting the best delivery method in Malaysia. Each delivery method, apart from actual project delivery itself, entails different apportionment of project risks between the owner and contractor. Choosing the right delivery method can lead to project success, whereas selecting the wrong delivery method invariably leads to project failure.en_US
dc.description.abstract(cont.) For the private sector in Malaysia, the owner can pretty much choose the most commercially viable project delivery method. However, for the public sector, there are political and policy considerations, and rules and regulations which may affect the choice of project delivery method. As a developing country, there is much that Malaysia can learn from the US and other developed countries which are more advanced and experienced in terms of project delivery methods, construction and engineering.en_US
dc.description.statementofresponsibilityby Yew Chin Tan.en_US
dc.format.extent65 leavesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/37446en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectArchitecture.en_US
dc.titleA handbook for improving real estate project delivery in Malaysia : analysis, comparison and selecting the best methoden_US
dc.typeThesisen_US
dc.description.degreeS.M.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Architecture
dc.identifier.oclc123446723en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record