dc.contributor.advisor | Thomas W. Eagar and Donald B. Rosenfield. | en_US |
dc.contributor.author | Polizzi, Michael A. (Michael Allen) | en_US |
dc.date.accessioned | 2007-06-28T12:40:29Z | |
dc.date.available | 2007-06-28T12:40:29Z | |
dc.date.copyright | 1996 | en_US |
dc.date.issued | 1996 | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.1/37803 | |
dc.description | Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1996, and Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1996. | en_US |
dc.description | Includes bibliographical references (leaf 60). | en_US |
dc.description.statementofresponsibility | by Michael A. Polizzi. | en_US |
dc.format.extent | 60 leaves | en_US |
dc.language.iso | eng | en_US |
dc.publisher | Massachusetts Institute of Technology | en_US |
dc.rights | M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. | en_US |
dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | |
dc.subject | Sloan School of Management | en_US |
dc.subject | Mechanical Engineering | en_US |
dc.title | Methodology for the synchronization of material flow in an assembly plant | en_US |
dc.type | Thesis | en_US |
dc.description.degree | M.S. | en_US |
dc.contributor.department | Sloan School of Management | en_US |
dc.contributor.department | Massachusetts Institute of Technology. Department of Mechanical Engineering | |
dc.identifier.oclc | 35748383 | en_US |