MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Optimizing inventory levels using financial, lifecycle and forecast variance data

Author(s)
Hwang, Irene S
Thumbnail
DownloadFull printable version (4.723Mb)
Other Contributors
Leaders for Manufacturing Program.
Advisor
Donald B. Rosenfield and Duane Boning.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
Significant inventory write-offs have recently plagued ATI Technologies, a world leader in graphics and media processors. ATI's product-centric culture has long deterred attention from supply chain efficiency. Given that manufacturing lead time exceeds customer order lead time for its semiconductors, ATI relies heavily on their demand forecasting team to instigate supply chain activities. The PC business unit forecasting team translates market information into product-line forecast and also sets finished goods inventory levels intended to offset demand uncertainty. Today's inventory decisions are made in response to customer escalations, often ignoring financial implications. To add necessary rigor when setting these inventory levels, this thesis presents a model using wafer and unit cost, profit margin, product lifecycle stage and historical forecast error to categorize products into inventory risk levels. The resultant risk levels become a critical input to monthly demand-supply meetings with marketing, operations and senior executives - the outcome of which are wafer orders and assembly and test plans at the world's largest contract foundries and subcontractors. Finally, the 2006 acquisition of ATI by Advanced Micro Devices (AMD) offers unforeseen flexibility, scale and challenges to the outsourced semiconductor supply chain.
Description
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science; in conjunction with the Leaders for Manufacturing Program at MIT, 2007.
 
Includes bibliographical references (leaves 47-48).
 
Date issued
2007
URI
http://hdl.handle.net/1721.1/39593
Department
Leaders for Manufacturing Program at MIT; Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science; Sloan School of Management
Publisher
Massachusetts Institute of Technology
Keywords
Sloan School of Management., Electrical Engineering and Computer Science., Leaders for Manufacturing Program.

Collections
  • Graduate Theses

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.