Show simple item record

dc.contributor.advisorStephen C. Graves and David Simchi-Levi.en_US
dc.contributor.authorUnderwood, Curtis J. (Curtis James)en_US
dc.contributor.authorWood, Jacob Ren_US
dc.contributor.otherLeaders for Manufacturing Program.en_US
dc.date.accessioned2007-12-07T16:08:09Z
dc.date.available2007-12-07T16:08:09Z
dc.date.copyright2007en_US
dc.date.issued2007en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/39694
dc.descriptionThesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2007.en_US
dc.descriptionIncludes bibliographical references (p. 74).en_US
dc.description.abstractAs the medium voltage switchgear industry moves from air insulated to gas insulated technology, Siemens Frankfurt factory is introducing a new gas insulated product line that will improve their relative market position. It is their intent to design a product and supporting production system that will enable substantial cost and lead time reduction over existing Siemens gas insulated switchgear products. This thesis outlines a framework for analyzing the existing production process from 'customer order to customer delivery', identifying areas of opportunity, valuing projects aimed at achieving these opportunities, and prioritizing highest value projects for implementation. To provide a rigorous analytical approach to project selection, it was important to rethink existing ways of valuing inventory holding costs, material handling costs, and lead time. By uncovering hidden costs and benefits for each, projects that otherwise seemed unattractive become important to achieving overall factory objectives. Conversely, other projects that had been historically pushed by factory leadership were shown to generate little overall return on investment.en_US
dc.description.abstract(cont.) By using the approach outlined in this thesis, improved alignment was achieved across departments on several high value projects. This alignment positioned the factory to move forward with plans for successful implementation. It is the authors' hope that Frankfurt not only finalizes implementation of high value projects identified during this analysis, but also use the framework provided for future analysis and continued improvement.en_US
dc.description.statementofresponsibilityby Curtis J. Underwood & Jacob R. Wood.en_US
dc.format.extent74 p.en_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectSloan School of Management.en_US
dc.subjectCivil and Environmental Engineering.en_US
dc.subjectLeaders for Manufacturing Program.en_US
dc.titleApplying an analytical framework to production process improvementen_US
dc.typeThesisen_US
dc.description.degreeS.M.en_US
dc.description.degreeM.B.A.en_US
dc.contributor.departmentLeaders for Manufacturing Program at MITen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Civil and Environmental Engineering
dc.contributor.departmentSloan School of Management
dc.identifier.oclc176066343en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record