Show simple item record

dc.contributor.advisorStephen C. Graves.en_US
dc.contributor.authorQian, Yi, M. Eng. Massachusetts Institute of Technologyen_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Mechanical Engineering.en_US
dc.date.accessioned2008-09-03T15:21:02Z
dc.date.available2008-09-03T15:21:02Z
dc.date.copyright2007en_US
dc.date.issued2007en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/42327
dc.descriptionThesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2007.en_US
dc.descriptionIncludes bibliographical references (p. 46).en_US
dc.description.abstractMany manufacturing firms have improved their operations by implementing a work-in-process (WIP) limiting control strategy. This project explores the application of this concept to limit WIP and reduce cycle time for the Becton, Dickinson and Company's manufacturing facility in Tuas, Singapore. BD's Eclipse Safety Needle production line is facing increasing pressure to reduce its high WIP and long cycle times. With the forecast of increasing demand, the current production control practice will sooner or later push the shop floor space to a limit. We divided the overall system into three manageable sub-systems and analyzed different strategies for each. This paper documents the approaches to Needle Assembly machine (AN) and downstream machines, as well as the inventory policy for Needle Shield (NS) and Safety Shield (SS) molded components. At AN and downstream, we can achieve significant reduction in cycle time and work in process by eliminating the unnecessary early start of production and extra delay caused from the current planning method, by reducing transfer batch sizes and by applying mixed scheduling policy at AN. We can obtain further improvement by implementing a CONWIP release rule. For the stocking of NS and SS molded parts, a simple periodic review, base stock inventory policy can effectively reduce the current inventory level by more than 40%, as well as reduce the inventory variation.en_US
dc.description.statementofresponsibilityby Yi Qian.en_US
dc.format.extent46 p.en_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titleReduced cycle time and work in process in a medical device factory : the problem and a proposed solutionen_US
dc.title.alternativeReduced cycle time and WIP in a medical device factory : the problem and a proposed solutionen_US
dc.typeThesisen_US
dc.description.degreeM.Eng.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.identifier.oclc232668312en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record