Show simple item record

dc.contributor.advisorCharles H. Fine and Daniel E. Whitney.en_US
dc.contributor.authorVoges, Jens P. (Jens Peter), 1972-en_US
dc.contributor.otherLeaders for Manufacturing Program.en_US
dc.date.accessioned2009-02-17T17:25:19Z
dc.date.available2009-02-17T17:25:19Z
dc.date.copyright2002en_US
dc.date.issued2002en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/44609
dc.descriptionThesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2002.en_US
dc.descriptionIncludes bibliographical references (leaf 69).en_US
dc.description.abstractAs companies outsource more manufacturing and design responsibilities to external vendors and therefore become less vertically integrated, the role of supply chain management becomes increasingly complex. Its role is particularly difficult when product generation follows a serial process flow, with the supply chain function residing at the end and where it inherits poorly defined supplier relationships. A more integrated approach that seeks to proactively design the supply chain during product generation is required. Central to this integrated approach is the timely exchange of information both within the company, between R&D and procurement, and external to the company, between procurement and its suppliers. The timing of the information flow is crucial. It needs to occur before the company is locked into a single supplier and when its bargaining power is the highest. It also needs to occur in a manner that does not slow down the product development process. In practice, that means that specific information needs to be exchanged and committed to prior to supplier selection. Ultimately, the information exchange described in this thesis leads to improved supplier relations that enable the company to shift its procurement practices from the tactical approach of buying materials to the strategic approach of buying supply services. The research for this thesis was conducted at a partner company of the Leaders for Manufacturing (LFM) program. The company manufactures test equipment used in the semiconductor industry. Due to the highly cyclical and unpredictable nature of this industry, supply chains that can guarantee responsiveness and availability are desirable. The supply chain design recommendations proposed in this thesis are based on an analysis of a recent product generation program at the company. By continuing to implement these recommendations, the company should benefit from shorter product development cycle times, smoother production ramps, improved customer service levels and lower sourcing costs.en_US
dc.description.statementofresponsibilityby Jens P. Voges.en_US
dc.format.extent69 leavesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectSloan School of Management.en_US
dc.subjectMechanical Engineering.en_US
dc.subjectLeaders for Manufacturing Program.en_US
dc.titleSupply chain design in the volatile semiconductor capital equipment industryen_US
dc.typeThesisen_US
dc.description.degreeS.M.en_US
dc.description.degreeM.B.A.en_US
dc.contributor.departmentLeaders for Manufacturing Program at MITen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.contributor.departmentSloan School of Management
dc.identifier.oclc50655098en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record