Show simple item record

dc.contributor.advisorThomas W. Eagar and Arnold Barnett.en_US
dc.contributor.authorZojwalla, Shaheen J. (Shaheen Joyab), 1977-en_US
dc.contributor.otherLeaders for Manufacturing Program.en_US
dc.date.accessioned2009-02-17T17:25:25Z
dc.date.available2009-02-17T17:25:25Z
dc.date.copyright2004en_US
dc.date.issued2004en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/44610
dc.descriptionThesis (S.M.)--Massachusetts Institute of Technology, Dept. of Materials Science and Engineering; and, (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2004.en_US
dc.descriptionIncludes bibliographical references (p. 63).en_US
dc.description.abstractDue to a number of different production issues, the manufacture of template pipes is often delayed. These delays hold up pipe system completion on board the ships in production and can delay payments from the Ministry of Defense. In order to improve the production of template pipes, a number of changes are recommended to the pipe production processes overall. These include improvements in production planning, along with changes in procurement and scheduling methods. These changes in production methods will result in more material available when it is needed and will therefore improve the manufacture of template pipes. Additionally, they will improve the overall availability of pipes when needed as well as reducing inventory of finished pipes and decreasing the amount of rework. A number of other recommendations to improve the overall pipe manufacture process are also identified, including changes in performance measures, production planning, and other potential areas of improvement.en_US
dc.description.statementofresponsibilityby Shaheen J. Zojwalla.en_US
dc.format.extent74 p.en_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMaterials Science and Engineering.en_US
dc.subjectSloan School of Management.en_US
dc.subjectLeaders for Manufacturing Program.en_US
dc.titleSmoothing of pipe system completion processes in a shipyard environment/en_US
dc.typeThesisen_US
dc.description.degreeM.B.A.en_US
dc.description.degreeS.M.en_US
dc.contributor.departmentLeaders for Manufacturing Program at MITen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Materials Science and Engineering
dc.contributor.departmentSloan School of Management
dc.identifier.oclc56029630en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record