Show simple item record

dc.contributor.advisorFred Moavenzadeh.en_US
dc.contributor.authorBar-Or, Emmanuelen_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Civil Engineering.en_US
dc.date.accessioned2009-03-16T19:24:56Z
dc.date.available2009-03-16T19:24:56Z
dc.date.copyright1984en_US
dc.date.issued1984en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/44649
dc.descriptionThesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1984.en_US
dc.descriptionMICROFICHE COPY AVAILABLE IN ARCHIVES AND ENGINEERING.en_US
dc.descriptionBibliography: leaves 122-123.en_US
dc.description.statementofresponsibilityby Emmanuel Bar-Or.en_US
dc.format.extent123 leavesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectCivil Engineering.en_US
dc.titleApplication of the option valuation model to construction projectsen_US
dc.typeThesisen_US
dc.description.degreeM.S.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Civil Engineeringen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Civil and Environmental Engineering
dc.identifier.oclc12634339en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record