MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Supplier relationship management best practices applied to the manufacture of a helicopter airframe in China

Author(s)
King, R. Jon (Ralph Jon)
Thumbnail
DownloadFull printable version (17.79Mb)
Other Contributors
Leaders for Manufacturing Program.
Advisor
Charles H. Fine and Abbott D. Weiss.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
Sikorsky's recently begun program to manufacture the S-76 helicopter airframe at a supplier in China is examined as a case study of supplier relationship management. Best practices and key principles from the literature and other industry case studies are identified. Key concepts covered include: importance of product architecture and supplier strategic role on the appropriate type of supplier relationship to develop; the different stages of relationship management; the concept of making investments in a supplier relationship as a way of achieving desired relationship closeness; the importance of geography and culture on foreign supplier relationships. The best practices and principles are then used to analyze Sikorsky's performance in the China S- 76 airframe program to date. It is found that while Sikorsky is engaged in several key supplier relationship management activities, significant improvement could be made by more carefully considering how to overcome geographic and cultural distance and by making decisions about relationship investments in a more analytical way, with a focus on bottom-line financial impact. Finally, a generalized process for managing supplier relationships is developed. The six steps are: * Determine the appropriate relationship to develop with the supplier * Determine current supply chain proximity with the supplier * Determine stage of supplier relationship management and appropriate type of investments * Develop menu of relationship investment options * Determine the attractiveness of investment options * Select, prioritize and make investments.
Description
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2009.
 
Page 67 blank.
 
Includes bibliographical references (p. 65-66).
 
Date issued
2009
URI
http://hdl.handle.net/1721.1/50090
Department
Leaders for Manufacturing Program at MIT; Massachusetts Institute of Technology. Department of Mechanical Engineering; Sloan School of Management
Publisher
Massachusetts Institute of Technology
Keywords
Sloan School of Management., Mechanical Engineering., Leaders for Manufacturing Program.

Collections
  • Graduate Theses

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.