Head & base production optimization : setup time reduction
Author(s)
Guo, Haiqing
DownloadFull printable version (5.668Mb)
Alternative title
Head and base production optimization : setup time reduction
Other Contributors
Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
Advisor
Kamal Youcef-Toumi.
Terms of use
Metadata
Show full item recordAbstract
At Schlumberger, the make-to-order strategy and number of Head & Base product types (about 1000 types) requires a flexible manufacturing system in which the machine setup is frequent. However, the lengthy CNC machine setup time in the Head & Base machining station directly affects the manufacturing capacity. This research implements Single Minute Exchange of Die (SMED) methodology and proposes a set of solutions, such as manufacturing sequence optimization, setup sequence optimization, setup operation simplification, etc, to reduce setup time without sacrificing quality. Most of the solutions have been implemented and the result is significant and impressive, the overall setup time has been reduced by up to 40 percent and the expected cost saving is about 50,000 USD.
Description
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009. Cataloged from PDF version of thesis. Includes bibliographical references (p. 53).
Date issued
2009Department
Massachusetts Institute of Technology. Department of Mechanical EngineeringPublisher
Massachusetts Institute of Technology
Keywords
Mechanical Engineering.