Show simple item record

dc.contributor.advisorStephen C. Graves.en_US
dc.contributor.authorMohd Fauzi, Mohammed Faizal Ben_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Mechanical Engineering.en_US
dc.date.accessioned2010-05-25T21:06:53Z
dc.date.available2010-05-25T21:06:53Z
dc.date.copyright2009en_US
dc.date.issued2009en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/55226
dc.descriptionThesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (p. 80-81).en_US
dc.description.abstractThis study was conducted at a medical device production facility where analysis was done on the reliability of Product S barrel molds for the purpose of predicting preventive maintenance (PM) schedule. Pareto Rule was utilized to filter out the defect-types that are causing 80% of the defect occurrences. Defect density was introduced, i.e. the ratio between total number of defects occurred per cavity position to the total types of defects occurring on that same position, as a performance measure to track defects over the mold cavities . Statistical distribution tests on the failure times of the molds were carried out and found that the failure times for the molds differ. Mold failure times follow the log normal or Weibull distribution. Parameter estimates obtained from probability plots of these distributions were used to obtain the mean-time-to-failure (MTTF) and reliability of the molds. Finally, this study looked into the scheduled preventive maintenance (PM) of the molds based on the current PM task list. Failure times based on individual mold PM task lists that correspond to the mitigation of the priority defect-types, were collected and assigned a statistical distribution. After which, we analyzed the expected number of annual mold failures based on the relevant parameters of the failure times distribution and the various PM scheduling policies proposed, to derive a recommendation on the optimal PM interval to be performed in a year.en_US
dc.description.statementofresponsibilityby Mohammed Faizal B Mohd Fauzi.en_US
dc.format.extent[i], 103 p.en_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titlePreventive maintenance scheduling based on failure data in a medical device manufacturing facilityen_US
dc.typeThesisen_US
dc.description.degreeM.Eng.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.identifier.oclc611950538en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record