Show simple item record

dc.contributor.authorWasserman, Andrew.en_US
dc.date.accessioned2011-02-23T14:08:43Z
dc.date.available2011-02-23T14:08:43Z
dc.date.copyright1972en_US
dc.date.issued1972en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/61072en_US
dc.descriptionThesis: B.S., Massachusetts Institute of Technology, Department of Electrical Engineering, 1972en_US
dc.descriptionTwenty-nine unnumbered leaves inserted.en_US
dc.descriptionBibliography: leaf [60].en_US
dc.format.extent59, [29] leavesen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsMIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectElectrical Engineeringen_US
dc.titleA simulation of the IBM 370/155 job scheduling algorithm.en_US
dc.typeThesisen_US
dc.description.degreeB.S.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Electrical Engineeringen_US
dc.identifier.oclc24281508en_US
dc.description.collectionB.S. Massachusetts Institute of Technology, Department of Electrical Engineeringen_US
dspace.imported2023-07-06T22:44:02Zen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record