Show simple item record

dc.contributor.advisorStephen C. Graves.en_US
dc.contributor.authorOh, Shao Chongen_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Mechanical Engineering.en_US
dc.date.accessioned2011-04-25T16:10:05Z
dc.date.available2011-04-25T16:10:05Z
dc.date.copyright2010en_US
dc.date.issued2010en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/62504
dc.descriptionThesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (p. 49).en_US
dc.description.abstractThe demand for Gas Lift Mandrels(GLM) in the oil and gas industry is expected to increase over the next few years, requiring Schlumberger's GLM assembly line to increase their manufacturing capacity. Given the labor-intensive nature of Schlumberger's GLM assembly line, other than implementing kaizens and purchasing more equipment, it is important to also consider manpower issues. This research analyzes manpower management issues in the GLM assembly line to meet the projected increase in customer demand over the next three years. A detailed time study was conducted to understand and characterize all processes in the assembly line, before manpower plans were drawn up for each year till 2013. Several manpower scheduling concepts were incorporated in the manpower plan, such as Job Rotation and Workforce Flexibility to optimize the rate of utilization, human performance and well-being. By clustering processes together, the labor utilization rate can be increased to more than ninety percent. A new position of grinders has also been proposed to assist in various grinding operations, in order to reduce the cycle times of processes, to help workers gain better focus in their work and to reduce the cost of labor.en_US
dc.description.statementofresponsibilityby Shao Chong Oh.en_US
dc.format.extent56 p.en_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titleManpower planning and cycle-time reduction of a labor-intensive assembly lineen_US
dc.typeThesisen_US
dc.description.degreeM.Eng.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.identifier.oclc712599356en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record