Show simple item record

dc.contributor.advisorStephen C. Graves.en_US
dc.contributor.authorTan, Wei Yungen_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Mechanical Engineering.en_US
dc.date.accessioned2011-04-25T16:10:54Z
dc.date.available2011-04-25T16:10:54Z
dc.date.copyright2010en_US
dc.date.issued2010en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/62509
dc.descriptionThesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (p. 61).en_US
dc.description.abstractWe examine the production planning and scheduling of a job shop environment of a machining cell in a manufacturing facility. This thesis addresses the scheduling limitations in the machining cell that can result in unbalanced loading and idling of machines as well as longer manufacturing lead times. A method was developed to use Microsoft Project 2007 as a tool to enable dynamic production planning and control in the shop floor. In order for a proper model to be set up, relevant observations were made and required data collected. In Microsoft Project, work orders were scheduled using an active-nondelay hybrid scheduling technique. This technique resulted in short makespan with high machine utilization, low average waiting time, and low WIP. Simulated manufacturing lead times were also reduced to an average of 1.5 weeks compared to current manufacturing lead times of about 3 - 4 weeks, showing significant improvement. Further observations revealed that machine utilizations could not be balanced further than what was achieved without changing the machine routings of the components. Alternatively, if process times on the bottleneck machine could be reduced, more balanced loads could be achieved as well. If recommendations to the company were implemented, we expect that there will be an increase in the overall machining cell output capacity and a reduction in overall manufacturing lead times and WIP levels due to shorter processing times, higher machine utilizations, and better production planning.en_US
dc.description.statementofresponsibilityby Wei Yung Tan.en_US
dc.format.extent82 p.en_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titleDeveloping an improved production planning method for a machining cell using an active-nondelay hybrid scheduling techniqueen_US
dc.typeThesisen_US
dc.description.degreeM.Eng.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.identifier.oclc712601911en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record