MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Productivity and system improvements in an organic photovoltaic panel manufacturing facility

Author(s)
Chow, Jason (Jason Tsz Lok)
Thumbnail
DownloadFull printable version (14.79Mb)
Other Contributors
Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
Advisor
David E. Hardt.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
The MIT Master of Engineering in Manufacturing team worked on productivity and operational improvement projects with Konarka Technologies, Inc., a world-leading organic photovoltaic panel manufacturing facility that is in the process of ramping up their production volumes to meet growing demand. This thesis focuses on the development of an automatic inventory tracking system and data collection tools to be used for accurate production scheduling in the organic photovoltaic (OPV) finishing process after the OPVs have been coated with the active material). Because of the significant labor hours required and inaccuracies involved in manual inventory counting, an automated inventory tracking system was developed for the finishing processes using barcode readers and a Microsoft SQL Server database. The panel yield and time stamp information collected from the database was used as the basis for statistical analysis of solar performance testing data. This statistical data, as well as other time study data, was then applied in the development of a comprehensive production scheduling tool for accurate lead-time prediction for the different product types. Through increased accuracy in production scheduling, the productivity of the manufacturing facility can be improved.
Description
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2011.
 
Cataloged from PDF version of thesis.
 
Includes bibliographical references (p. 97-98).
 
Date issued
2011
URI
http://hdl.handle.net/1721.1/69483
Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Publisher
Massachusetts Institute of Technology
Keywords
Mechanical Engineering.

Collections
  • Graduate Theses

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.