Show simple item record

dc.contributor.advisorLeonard J. Morse-Fortier.en_US
dc.contributor.authorTaneda, Makotoen_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Architecture.en_US
dc.date.accessioned2012-04-26T18:34:43Z
dc.date.available2012-04-26T18:34:43Z
dc.date.copyright1996en_US
dc.date.issued1996en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/70276
dc.descriptionThesis (M.S.)--Massachusetts Institute of Technology, Dept. of Architecture, 1996.en_US
dc.descriptionIncludes bibliographical references (leaves 115-116).en_US
dc.description.abstractIn this study, we have examined the application of Lee analysis method to the construction and renovation stages of a building project. The application of the Lee analysis is currently limited to the very early stages of a project life, namely at the concept and design stages. We propose application of the Lee method, with several modifications, to the construction and renovation stages. The simplified Lee method is proposed and examined in the first two case studies. The simplified method limits the range and complexity of data inputs, and is intended to be an Lee used by engineers practicing in the construction industry. In the third case study, the "Lee per square-foot", which implements the concept of the "square-foot" cost estimating, is proposed. This method is intended to be used to assess the residual value and to estimate running costs of an existing building. Necessary modifications of the Lee, as well as the accuracy and limits of these new methods are examined through three case studies.en_US
dc.description.statementofresponsibilityby Makoto Taneda.en_US
dc.format.extent116 leavesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectArchitecture.en_US
dc.titleApplication of life cycle costing method to a renovation projecten_US
dc.typeThesisen_US
dc.description.degreeM.S.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Architecture
dc.identifier.oclc35846140en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record