Show simple item record

dc.contributor.advisorHerbert H. Einstein.en_US
dc.contributor.authorHung, Vinnieen_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.en_US
dc.coverage.spatialn-us-nyen_US
dc.date.accessioned2012-10-10T15:45:15Z
dc.date.available2012-10-10T15:45:15Z
dc.date.copyright2012en_US
dc.date.issued2012en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/73787
dc.descriptionThesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2012.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (p. 67-69).en_US
dc.description.abstractGiven the frequent cost overruns and schedule delays associated with underground construction projects, it is imperative that a detailed estimate of both be developed and considered prior to starting construction. The Decision Aids for Tunnelling (DAT) allow engineers to consider the uncertainties associated with project ground conditions, construction activities, and problem events, and to determine distributions of total cost and time for completion of construction. This is done by simulating the geological conditions in each DAT simulation and then using the resulting conditions in further simulations of construction processes. As each simulation will only produce one resulting point with a value for cost and a value for time, numerous simulations must be run by the DAT in order to produce a complete scatter gram with a distribution of total possible costs and duration. This thesis utilizes the DAT to develop a distribution for the total cost and duration of constructing the New York City Number 7 Subway Line Extension Project's Running Tunnels using a tunnel boring machine. The results will show the applicability of the DAT, given pre-construction geologic information and post-construction TBM progress data but only total cost. As is to be expected, subsurface conditions were limited to pre-construction baseline information. Despite these limitations, use of available data by the DAT generated a scattergram, forecasting a range of possible cost and duration outcomes.en_US
dc.description.statementofresponsibilityby Vinnie Hung.en_US
dc.format.extent95 p.en_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectCivil and Environmental Engineering.en_US
dc.titleModeling uncertainty in the New York City no. 7 subway line extension project using Decision Aids for Tunnelling (DAT)en_US
dc.title.alternativeModeling uncertainty in the New York City no. 7 subway line extension project using Decision Aids for Tunneling (DAT)en_US
dc.typeThesisen_US
dc.description.degreeM.Eng.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Civil and Environmental Engineering
dc.identifier.oclc810444217en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record