MBTA Green Line 3-car train operating plans to enhance capacity and reliability

Author(s)
Malikova, Alexandra A
Thumbnail
DownloadFull printable version (11.07Mb)
Alternative title
Massachusetts Bay Transportation Authority Green Line 3-car train operating plans to enhance capacity and reliability
Other Contributors
Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.
Advisor
Frederick Salvucci and John P. Attanucci.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
Transit agencies face a variety of challenges, from increasing ridership to changes in infrastructure, to system expansions, all of which require significant preparation to accommodate the changes without affecting passengers or the agency negatively. The MBTA Green Line, a Boston light rail system serving nearly 230,000 average weekday passengers, will be undergoing major changes in the next two decades, including nearly doubling of ridership and system expansion. In order to prepare for these changes, measures need to be taken to increase capacity and plan for operations on the new segment. Starting in Fall 2010, the MBTA added to a 2-car train operation, and subsequently increased, a number of 3-car trains on three of the four Green Line branches, in order to begin to address the capacity issue. This thesis analyzes service performance before and after implementation of 3-car trains to find that although scheduled capacity increased slightly, the actual capacity of the system remained constant during the morning peak period and decreased during the evening peak period. Furthermore, there were some negative impacts with respect to passenger waiting time and running times, thus worsening the overall passenger experience. However, since 3-car trains will be required for increasing capacity on the Green Line, it is recommended that trials of 3-car trains continue, with the restriction that only 2- or 3-car trains operate on a branch. Furthermore, field observations at terminal stations on two of the branches show differences in operations management practices, which help explain some variability in service along the route, and point to strategies to improve service reliability.
Description
Thesis (S.M. in Transportation)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2012.
 
This electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections.
 
Cataloged from student submitted PDF version of thesis.
 
Includes bibliographical references (p. 147-149).
 
Date issued
2012
URI
http://hdl.handle.net/1721.1/74271
Department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering
Publisher
Massachusetts Institute of Technology
Keywords
Civil and Environmental Engineering.

Collections
  • Graduate Theses

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.