Search
Now showing items 1-10 of 15
National environmental & sustainability strategies for automobiles in Thailand
(Massachusetts Institute of Technology, 1998)
Dynamic strategic planning for transportation infrastructure investment in Japan
(Massachusetts Institute of Technology, 1999)
Intercomparison of soil hydrology modules in the MIT Integrated Global System Model for analysis of climate issues
(Massachusetts Institute of Technology, 1998)
The availability of water at or near the surface determines the way incident radiative energy is partitioned at the ground surface. The goal of this thesis is to determine if better hydrological representation in the MIT ...
Taiwan's industrial structural change and its implication on energy intensity
(Massachusetts Institute of Technology, 1999)
The objective of this thesis is to analyze how the shift in industrial mix had contributed to the energy intensity in Taiwan. The concern for energy intensity is mainly because it is directly related to Carbon Dioxide (CO2) ...
Managing privately produced rail transit systems : a case study of Tren Urbano
(Massachusetts Institute of Technology, 1998)
Use of Geographic Information Systems (GIS) to aid in siting dredged material disposal areas
(Massachusetts Institute of Technology, 1998)
Dredging of the ports and waterways in the United States has implications for the economy and military preparedness and is hampered by a lack of disposal areas. Current dredged material disposal site selection methodologies ...
Remote information organization and decentralized education
(Massachusetts Institute of Technology, 1999)
Application of dynamic strategic planning to urban transit projects : case studies of Boston and Osaka
(Massachusetts Institute of Technology, 1999)
Valuing project risk and flexibility in mining resource development
(Massachusetts Institute of Technology, 1999)
HSPF modeling of the Charles River Watershed
(Massachusetts Institute of Technology, 1998)
This thesis develops a hydrological and water quality model of the Charles River Watershed in eastern Massachusetts. The model used for this project is HSPF, an EPA-sponsored continuous simulation model. Based on land use ...