Scheduling a global engine maintenance network
(Massachusetts Institute of Technology, 2016)
This thesis addresses the allocation of gas turbine aircraft engines to maintenance facilities. Scheduling a global engine maintenance network can be very complex and challenging. This project pertains particularly to the ...
Accelerating the onboarding of a new factory partner
(Massachusetts Institute of Technology, 2016)
Nike established the Advanced Manufacturing team to create a future of manufacturing that will be able to better meet growing customer expectations, battle rising costs of production, and unlock new design capabilities. ...
Program scheduling : decreasing flow by back-scheduling
(Massachusetts Institute of Technology, 2016)
The Boeing 737 program has announced that they will continue to increase their production rate from 42 airplanes per month to eventually 52 airplanes per month. In order for the field to accommodate the increased production ...