Search
Now showing items 1-9 of 9
Cost effect of uniquely designed component choices of over the product life of a workstation
(Massachusetts Institute of Technology, 1997)
Root cause analysis of low on-time delivery performance at a computer manufacturing plant
(Massachusetts Institute of Technology, 1997)
Design and implementation of cellular manufacturing in a job shop environment
(Massachusetts Institute of Technology, 1997)
Methodologies for design of low-volume, international automotive assembly plant, with emphasis on site selection and body shop design
(Massachusetts Institute of Technology, 1997)
Logistics and inventory management for supporting the customer service function
(Massachusetts Institute of Technology, 1998)
Developing a framework for international outsourcing in the commerical aircraft industry
(Massachusetts Institute of Technology, 1998)
Rapid quality feedback through lean manufacturing
(Massachusetts Institute of Technology, 1997)
Impact of product configurations on lead time and profits
(Massachusetts Institute of Technology, 1997)
The reengineering of a computer assembly plant
(Massachusetts Institute of Technology, 1998)