Search
Now showing items 161-165 of 165
Measurement and prediction of inpatient case manager workload in a tertiary hospital setting
(Massachusetts Institute of Technology, 2016)
A patient's care needs often extend past discharge from an acute hospital setting. At Massachusetts General Hospital (MGH), inpatient case managers, acting in a discharge planning capacity, help develop and coordinate the ...
Scheduling a global engine maintenance network
(Massachusetts Institute of Technology, 2016)
This thesis addresses the allocation of gas turbine aircraft engines to maintenance facilities. Scheduling a global engine maintenance network can be very complex and challenging. This project pertains particularly to the ...
Accelerating the onboarding of a new factory partner
(Massachusetts Institute of Technology, 2016)
Nike established the Advanced Manufacturing team to create a future of manufacturing that will be able to better meet growing customer expectations, battle rising costs of production, and unlock new design capabilities. ...
Program scheduling : decreasing flow by back-scheduling
(Massachusetts Institute of Technology, 2016)
The Boeing 737 program has announced that they will continue to increase their production rate from 42 airplanes per month to eventually 52 airplanes per month. In order for the field to accommodate the increased production ...
Optimizing emergency response crew allocation during earthquakes to improve restoration time
(Massachusetts Institute of Technology, 2017)
Northern California and specially the San Francisco Bay Area where PG&E operates is very susceptible to earthquakes. United States Geological Survey (USGS) estimates a 63 percent chance that a magnitude-6.7 or larger ...