MIT Libraries homeMIT Libraries logoDSpace@MIT

MIT
Search 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Search
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Search

Show Advanced FiltersHide Advanced Filters

Filters

Use filters to refine the search results.

Now showing items 31-40 of 43

  • Sort Options:
  • Relevance
  • Title Asc
  • Title Desc
  • Issue Date Asc
  • Issue Date Desc
  • Results Per Page:
  • 5
  • 10
  • 20
  • 40
  • 60
  • 80
  • 100
Thumbnail

Development of a tool for forecasting a warehouse facility footprint and enabling rapid scenario analysis 

Sutterer, Lucas B. (Lucas Benjamin) (Massachusetts Institute of Technology, 2010)
Companies in every industry, including both manufacturers and service providers, must make decisions about their operational footprint -the amount of building space required for business needs such as storing inventory and ...
Thumbnail

Using lead time data to identify cost saving opportunities in an automotive supply chain : inventory safety stock and trucking carrier pool 

Bolton, Jennifer Sarah (Massachusetts Institute of Technology, 2014)
Lead time information from suppliers influences decisions at every level of a supply chain, from sourcing and purchasing, to inventory policies, transportation, and plant design. Large volume, high complexity manufacturers, ...
Thumbnail

Fulfillment algorithm for integrating stock between brick and mortar and E-commerce 

Foster, Scott Douglas, M.B.A. Sloan School of Management (Massachusetts Institute of Technology, 2018)
This thesis proposes a novel fulfillment algorithm which maximizes profits and customer experience through optimal distribution in a multi-period setting for a set of shipping locations that includes both stores and ...
Thumbnail

Separating signal from noise : material demand forecasting and network simulation in a multi-echelon supply chain 

Dekel, Shai, S. M. Massachusetts Institute of Technology (Massachusetts Institute of Technology, 2018)
Mismatches between forecasted and actual demand, for construction, repair and maintenance work in a regulated utility, is a growing risk for the performance of the supply chain. High target service levels and high levels ...
Thumbnail

Disaggregation of residential home energy via non-intrusive load monitoring for energy savings and targeted demand response 

Hare, Jeremy (Jeremy B.) (Massachusetts Institute of Technology, 2018)
Residential energy disaggregation is a process by which the power usage of a home is broken down into the consumption of individual appliances. There are a number of different methods to perform energy disaggregation, from ...
Thumbnail

Predicting corrosion on protected buried steel natural gas distribution pipelines 

Meyer, Lillian Ruth (Massachusetts Institute of Technology, 2015)
PG&E uses cathodic protection, which connects the pipeline to sacrificial anodes that corrode instead of the pipeline, to prevent corrosion on its buried steel natural gas pipelines. However, corrosion leaks still occur. ...
Thumbnail

Robust network design 

Chua, Shui Ying (Massachusetts Institute of Technology, 2015)
As an equipment manufacturer for the mining and construction industries, Caterpillar's business is heavily impacted by the cyclicality of these two industries. To be competitive in the market while investing prudently to ...
Thumbnail

Inbound supply chain optimization with ship-mode variation in a fixed-capacity fulfillment center 

Birenbaum, Jeffrey (Jeffrey P.) (Massachusetts Institute of Technology, 2018)
each of the past two years. In order to scale with expected continued sales growth, Amazon has been investing heavily in its inbound supply chain, where product is received and allocated to various nodes, with cross-dock ...
Thumbnail

Reagent usage optimization In high volume diagnostics testing 

Sonmez, Hakan (Massachusetts Institute of Technology, 2018)
Company X provides healthcare diagnostics testing services. The company competes in the market by providing cost effective, short turn-around-time (TAT) solutions and a large variety of test selections. Reducing operating ...
Thumbnail

Modeling and centralization of strategic inventory for repairable and long lead-time spare parts 

Duncan, Tyeliah Elaine (Massachusetts Institute of Technology, 2011)
This thesis develops an optimal inventory model for repairable and long leadtime spare parts for an Engine overhaul business. In addition, it presents a business case for centralization of inventory. Pratt & Whitney purchased ...
  • 1
  • 2
  • 3
  • 4
  • 5

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CommunityBy Issue DateAuthorsTitlesSubjects

My Account

Login

Discover

AuthorAdib, Christian(Christian Tanios) (1)Alhamad, Hashim (1)Balent, Zachariah (Zachariah Francis) (1)Bazerghi, Audrey. (1)Birenbaum, Jeffrey (Jeffrey P.) (1)Bolton, Jennifer Sarah (1)Carroll, Brendan J., S.M. (Brendan Joseph). Massachusetts Institute of Technology (1)Chua, Shui Ying (1)Cryan, Dan David,III. (1)Das, Shouvik. (1)... View MoreDepartment
Department of Civil and Environmental Engineering (43)
Sloan School of Management (43)Leaders for Global Operations Program at MIT (42)Leaders for Manufacturing Program at MIT (1)Degree
M.B.A. (43)
S.M. (43)SubjectCivil and Environmental Engineering. (43)
Sloan School of Management. (43)
Leaders for Global Operations Program. (42)Leaders for Manufacturing Program. (1)... View MoreDate Issued2019 (12)2020 (10)2018 (9)2010 (3)2015 (3)2011 (2)2013 (1)2014 (1)2016 (1)2017 (1)Has File(s)Yes (43)

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries homeMIT Libraries logo

Find us on

Twitter Facebook Instagram YouTube RSS

MIT Libraries navigation

SearchHours & locationsBorrow & requestResearch supportAbout us
PrivacyPermissionsAccessibility
MIT
Massachusetts Institute of Technology
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.