Search
Now showing items 1-10 of 16
Qualification of the IBM CSC factory in Singapore : resource estimation and allocation in software and hardware services
(Massachusetts Institute of Technology, 2007)
The CSC department of IBM Singapore has been established two years ago. It provides a variety of hardware and software services for its customers. Due to the complex mix of products and the different ways of completing the ...
Understanding and developing capabilities for large area and continuous micro contact printing
(Massachusetts Institute of Technology, 2007)
Micro contact printing is a high spatial resolution-patterning tool that can be used for printing on large and non-planar surfaces because of which it has begun to find important applications in printed organic electronics ...
An optimal stock building strategy in a manufacturing company
(Massachusetts Institute of Technology, 2007)
This thesis aims to tackle a demand seasonality problem by building either work-in-process inventory or finished goods inventory before the peak season. A linear programming algorithm is developed to determine the optimal ...
The study of inventory management of raw materials for a pharmaceutical company
(Massachusetts Institute of Technology, 2007)
TCG is a multinational pharmaceutical company. As part of its drive to adopt lean manufacturing methodology in the plant and to stay competitive in the industry, TCG plans to effectively maximize its capital assets and ...
Association of lingual myoarchitecture with local mechanics during swallowing determined by magnetic resonance imaging
(Massachusetts Institute of Technology, 2007)
The tongue is an intricately configured muscular organ, which undergoes a series of rapid shape changes intended to first configure and then transport the bolus from the oral cavity to the pharynx during swallowing. In ...
A template modeling for an assembly control : the source chamber alignment
(Massachusetts Institute of Technology, 2007)
Managers and engineers are trying to lead Varian Semiconductor Equipment to a flow line shipment program, the intent being to eliminate the clean room area and ship all of the components of the ion implanter directly from ...
Flow line performance analysis and improvement
(Massachusetts Institute of Technology, 2007)
This thesis is application-driven, aiming to improve overall performance of a flow line. Specifically, the goal is to increase production rate of the line and reduce average WIP between stations by optimization of existing ...
A template modeling for an assembly control : jig design
(Massachusetts Institute of Technology, 2007)
The purpose of this thesis is to identify a solution for one of the several mechanical concerns that Varian Semiconductor Equipment is facing to achieve its goal. Managers and engineers are trying to lead Varian Semiconductor ...
The production planning and inventory management of finished goods for a pharmaceutical company
(Massachusetts Institute of Technology, 2007)
This thesis is the result of a three month internship at TCG Pharmaceuticals, Singapore. With the worldwide initiative of lean in TCG, it has implemented the TCG Production System which finds its roots in the famous Toyota ...
Pre-engagement process improvement in IBM PC services
(Massachusetts Institute of Technology, 2007)
The front end of the IBM PC factory integration & deployment process is a pre-engagement process. In this study, the pre-engagement process, was analyzed. The organizational structure in the pre-engagement process and the ...