MIT Libraries homeMIT Libraries logoDSpace@MIT

MIT
Search 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Search
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Search

Show Advanced FiltersHide Advanced Filters

Filters

Use filters to refine the search results.

Now showing items 1-10 of 16

  • Sort Options:
  • Relevance
  • Title Asc
  • Title Desc
  • Issue Date Asc
  • Issue Date Desc
  • Results Per Page:
  • 5
  • 10
  • 20
  • 40
  • 60
  • 80
  • 100
Thumbnail

Qualification of the IBM CSC factory in Singapore : resource estimation and allocation in software and hardware services 

Li, Chengguang, M. Eng. Massachusetts Institute of Technology (Massachusetts Institute of Technology, 2007)
The CSC department of IBM Singapore has been established two years ago. It provides a variety of hardware and software services for its customers. Due to the complex mix of products and the different ways of completing the ...
Thumbnail

Understanding and developing capabilities for large area and continuous micro contact printing 

Goel, Ambika; Laxminarayanan, Sowmya; Xia, Yun (Massachusetts Institute of Technology, 2007)
Micro contact printing is a high spatial resolution-patterning tool that can be used for printing on large and non-planar surfaces because of which it has begun to find important applications in printed organic electronics ...
Thumbnail

An optimal stock building strategy in a manufacturing company 

Li, Meng, M. Eng. Massachusetts Institute of Technology (Massachusetts Institute of Technology, 2007)
This thesis aims to tackle a demand seasonality problem by building either work-in-process inventory or finished goods inventory before the peak season. A linear programming algorithm is developed to determine the optimal ...
Thumbnail

The study of inventory management of raw materials for a pharmaceutical company 

Khor, Si Ming Thomas (Massachusetts Institute of Technology, 2007)
TCG is a multinational pharmaceutical company. As part of its drive to adopt lean manufacturing methodology in the plant and to stay competitive in the industry, TCG plans to effectively maximize its capital assets and ...
Thumbnail

Association of lingual myoarchitecture with local mechanics during swallowing determined by magnetic resonance imaging 

Felton, Samuel M., M. Eng. Massachusetts Institute of Technology (Massachusetts Institute of Technology, 2007)
The tongue is an intricately configured muscular organ, which undergoes a series of rapid shape changes intended to first configure and then transport the bolus from the oral cavity to the pharynx during swallowing. In ...
Thumbnail

A template modeling for an assembly control : the source chamber alignment 

Guerra, Simone, M. Eng. Massachusetts Institute of Technology (Massachusetts Institute of Technology, 2007)
Managers and engineers are trying to lead Varian Semiconductor Equipment to a flow line shipment program, the intent being to eliminate the clean room area and ship all of the components of the ion implanter directly from ...
Thumbnail

Flow line performance analysis and improvement 

Liu, Ang, M. Eng. Massachusetts Institute of Technology (Massachusetts Institute of Technology, 2007)
This thesis is application-driven, aiming to improve overall performance of a flow line. Specifically, the goal is to increase production rate of the line and reduce average WIP between stations by optimization of existing ...
Thumbnail

A template modeling for an assembly control : jig design 

Liscaio, Matteo (Massachusetts Institute of Technology, 2007)
The purpose of this thesis is to identify a solution for one of the several mechanical concerns that Varian Semiconductor Equipment is facing to achieve its goal. Managers and engineers are trying to lead Varian Semiconductor ...
Thumbnail

The production planning and inventory management of finished goods for a pharmaceutical company 

Gupta, Sumit, M. Eng. Massachusetts Institute of Technology (Massachusetts Institute of Technology, 2007)
This thesis is the result of a three month internship at TCG Pharmaceuticals, Singapore. With the worldwide initiative of lean in TCG, it has implemented the TCG Production System which finds its roots in the famous Toyota ...
Thumbnail

Pre-engagement process improvement in IBM PC services 

Zuo, Jie, M. Eng. Massachusetts Institute of Technology (Massachusetts Institute of Technology, 2007)
The front end of the IBM PC factory integration & deployment process is a pre-engagement process. In this study, the pre-engagement process, was analyzed. The organizational structure in the pre-engagement process and the ...
  • 1
  • 2

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CommunityBy Issue DateAuthorsTitlesSubjects

My Account

Login

Discover

AuthorFan, Siyu (1)Felton, Samuel M., M. Eng. Massachusetts Institute of Technology (1)Goel, Ambika (1)Guerra, Simone, M. Eng. Massachusetts Institute of Technology (1)Gupta, Sumit, M. Eng. Massachusetts Institute of Technology (1)Kasan Hidayat, Andy Darwin (1)Khor, Si Ming Thomas (1)Kok, Yixiong (1)Laxminarayanan, Sowmya (1)Li, Chengguang, M. Eng. Massachusetts Institute of Technology (1)... View MoreDepartmentDepartment of Mechanical Engineering (16)Department of Biological Engineering (1)Degree
M.Eng. (16)
S.B. (1)Subject
Mechanical Engineering. (16)
Biological Engineering Division. (1)... View MoreDate Issued
2007 (16)
Has File(s)
Yes (16)

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries homeMIT Libraries logo

Find us on

Twitter Facebook Instagram YouTube RSS

MIT Libraries navigation

SearchHours & locationsBorrow & requestResearch supportAbout us
PrivacyPermissionsAccessibility
MIT
Massachusetts Institute of Technology
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.