Change management, production ramp up and the sustainable supply chain in the transportation industry
(Massachusetts Institute of Technology, 2009)
The ramp up phase is always the most risky part of any project, especially with a product material the company and its partners have very little experience with. One result of this lack of experience is frequent engineering ...
Balancing tax incentives with operational risks in captive overseas production facilities
(Massachusetts Institute of Technology, 2009)
Due to the general macroeconomic downturn, many companies have turned to offshoring - sending a function overseas - to reduce production costs. While some companies elect to outsource overseas production to outside companies, ...
Estimation of system assembly and test manufacturing yields through product complexity normalization
(Massachusetts Institute of Technology, 2009)
Cisco Systems, Inc. (Cisco) has recently adopted Six Sigma as the main platform to drive quality improvements in its manufacturing operations. A key component of the improvement strategy is the ability to define appropriate ...
Supply chain design and site selection for the expansion of international manufacturing capacity
(Massachusetts Institute of Technology, 2009)
The research conducted for this thesis was performed at "Company X", a U.S.-based engineered goods manufacturer. This project focused on Company X's overall manufacturing strategy, with an emphasis on how global expansion ...
Developing a methodology to link printed circuit board assembly yield targets to commodity group quality goals
(Massachusetts Institute of Technology, 2009)
The increasing complexity of high-end routing products, a highly diverse product mix, and continually demanding quality requirements have intensified the challenges faced by Cisco. Primary among these is managing the broad ...
Mitigating the risk of a new workforce by reducing rework and rightsizing on hand inventory
(Massachusetts Institute of Technology, 2009)
Dramatically increasing the hourly workforce at a rapid pace to support accelerated product demand in an aircraft manufacturing facility in a short amount of time resulted in: (1) increased rework, and (2) increased part ...
Design and development of a supplier evaluation process
(Massachusetts Institute of Technology, 2009)
Low-cost sourcing is a strategy many companies, including Pratt & Whitney, use to reduce part costs. As they increase their efforts to resource products to low-cost regions, Pratt & Whitney needs a robust process to ...
Lean principle application in an automotive product development process with special emphasis on peer reviews
(Massachusetts Institute of Technology, 2009)
Global Automotive, a large US based, global manufacturer of automobiles, has made significant gains in manufacturing competitiveness, in part through application of a lean manufacturing approach to high volume assembly. A ...
Understanding, modeling and improving the development of complex products : method and study
(Massachusetts Institute of Technology, 2009)
Development of new aerostructure designs frequently occurs through a complex process that is difficult to understand and control. Tight requirements for weight, cost, strength, and aerodynamic behavior create many ...
Managing maintenance costs of pharmaceutical research and development
(Massachusetts Institute of Technology, 2009)
Drug Discovery is a race to be the first to patent a drug that meets a significant medical need in the world. Many pharmaceutical companies are now using automation extensively to improve consistency and aid personnel in ...