An alternative method of long lead-time tool purchases
Author(s)
Partlan, Eric W. (Eric William), 1973-
DownloadFull printable version (10.21Mb)
Other Contributors
Leaders for Manufacturing Program.
Advisor
Stephen C. Graves, Roy E. Welsch and Kamal Youcef-Toumi.
Terms of use
Metadata
Show full item recordDescription
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2002. Includes bibliographical references (p. 132-140).
Date issued
2002Department
Leaders for Manufacturing Program at MIT; Massachusetts Institute of Technology. Department of Mechanical Engineering; Sloan School of ManagementPublisher
Massachusetts Institute of Technology
Keywords
Sloan School of Management., Mechanical Engineering., Leaders for Manufacturing Program.