Show simple item record

dc.contributor.advisorKerri Cahoy.en_US
dc.contributor.authorClements, Emily Bakeren_US
dc.contributor.otherMassachusetts Institute of Technology. Department of Aeronautics and Astronautics.en_US
dc.date.accessioned2014-03-19T14:17:58Z
dc.date.available2014-03-19T14:17:58Z
dc.date.copyright2013en_US
dc.date.issued2013en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/85694
dc.descriptionThesis: S.M., Massachusetts Institute of Technology, Department of Aeronautics and Astronautics, 2013.en_US
dc.descriptionThis electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections.en_US
dc.descriptionCataloged from student-submitted PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (pages 101-104).en_US
dc.description.abstractMost space programs experience significant cost and schedule growth over the course of program development. Poor uncertainty management has been identified as one of the leading causes of program cost and schedule overruns. Traditional methods of uncertainty management are deterministic, using industry standards to predict worst-case inputs and designing systems accordingly. However, this method can lead to inefficient use of resources due to excessive need for redesign of subsystems when other subsystems evolve. Improvements in computational power now allow more sophisticated uncertainty analysis methods using probabilistic techniques. We propose a spacecraft design methodology that uses Monte Carlo and Gradient-based Sensitivity Analysis of system models to reduce program cost and schedule overruns by identifying design issues early when redesign is less expensive. We cover applications to mass budgets and finite element analysis to illustrate this methodology. The META complexity metric is a measure of uncertainty of a quantity of interest based on exponential entropy from information theory. The Trapped Energetic Radiation Satellite (TERSat) structural design process is used as a test case to evaluate the methodology, with a focus on the mass budget and finite element analysis. While traditionally mass budget uncertainty is treated with margins and contingencies, we present a way to model the mass of a system and its components as probability distributions using studies of historical data to model the means and standard deviations. We propagate the uncertainties in the mass budget analysis through the TERSat finite element model to determine the effects of the uncertainty on structural analysis outputs. We show that uncertainty analysis and sensitivity analysis can help to identify design issues early and guide the redesign and refine processes for spacecraft development.en_US
dc.description.statementofresponsibilityby Emily Baker Clements.en_US
dc.format.extent104 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectAeronautics and Astronautics.en_US
dc.titleCharacterizing uncertainty to manage risk in spacecraft development with application to structures and massen_US
dc.typeThesisen_US
dc.description.degreeS.M.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Aeronautics and Astronautics
dc.identifier.oclc871258630en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record